Multi-Toilet Ablution Block for Labour Camp Sanitation

Choose your size — six factory-built options

12x10 ft Multi-Toilet Ablution Block

₹2,10,000 + GST

₹2,47,800 incl. 18% GST

Base specification price; fixture schedule and site services quoted separately.

A multi-toilet ablution block is one wet-service building that serves a whole camp from a single plumbing manifold. Repeated WC, shower and basin banks sit along a service route, so a fitter can isolate one bank and work on it while the rest of the block stays open. SAMAN builds it as a waterproofed steel-framed block: a membrane floor with positive fall to trapped drains, washable moisture-tolerant linings, high-level privacy ventilation and sealed vent penetrations through an insulated roof. Choose it once your camp has outgrown single toilet cabins and you want one connection point, one cleaning round and one maintenance route instead of a scatter of separate units.

Published sizes
Six, 12x10 ft to 40x20 ft (120 to 800 sq ft)
Price from
Rs 2,10,000 ex-GST (Rs 2,47,800 incl. 18% GST)
Plan type
Single-loaded to 160 sq ft; two banks on a central pipe duct from 288 sq ft
Wet envelope
Nominal 50 mm PUF/PPGI panel or MS frame with moisture-resistant liner
Fixture schedule
Set from headcount, shifts and site rules, never from floor area

Custom sizes available · 500+ projects delivered · Factory-tested before dispatch

Product Information

SKU
SP-ABL-2024
Download the technical specification (PDF)

GST registered · ISO 9001:2015 certified manufacturer · 5-year structural and 1-year finishing warranty · Pan-India delivery

When One Wash Block Beats a Scatter of Single Toilet Cabins

Most camps reach this page after the single cabins stop coping. Ten units mean ten water connections, ten drain runs and ten cleaning stops, and the crew still queues at the two nearest ones. A multi-toilet ablution block replaces that with one building on one manifold, planned around the wash routine rather than around what fits on a trailer. It belongs inside a wider camp layout, so plan it alongside the accommodation and the service spine on your labour colony plot.

The block suits any project where the workforce stays long enough to justify a settled wash routine: a construction camp, a plant shutdown, a highway or transmission job, a mine, a relief deployment. Where you need sanitation for a few people at a gate, a single cabin is still the cheaper answer. Send us your headcount, your shift pattern and your drainage level, and request a fixed quotation; we return it within 48 hours.

Ablution block installed on an Indian labour camp site, entry and service side both visible

Choose the Depth Before You Choose the Length

Length adds cubicles. Depth changes the plan. At 10 ft the block runs one bank served from one wall. At 12 ft two banks face each other across a central pipe duct, and every fixture sits nearer its isolation valve.

  • 10 ft depth: one bank, shortest service run, smallest plot
  • 12 ft depth: two banks sharing one central pipe duct
  • 20 ft depth: dry entry lobby and split sides become possible
  • Every depth ships as one factory-built and wet-tested block
Send your camp headcount and site levels and request a fixed quotation.
Cornflower Blue 12x10 ft ablution block, front left three-quarter view, white trim and high-level privacy louvres

12x10 ft Ablution Block: The Smallest Standalone Bank

The 120 sq ft block is the smallest size we build as a shared facility rather than a cabin. One bank of cubicles runs along a single serviced wall, which keeps the pipe route short and the plot small. It suits a gate, a sub-camp, or a first phase that will grow later. Because every fixture sits on one wall, a single isolation point takes the whole block out of service, so plan the second block before the camp doubles rather than after.

  • Published size: 12x10 ft, 120 sq ft built-up wet-block area
  • Price: Rs 2,10,000 ex-GST (Rs 2,47,800 incl. 18% GST)
  • Plan: single-loaded, one serviced wall
  • Site: level standing with a clear working margin on the service side
12x10 ft120 sq ft₹2,10,000 + GST1,750/sq ft

12x10 ft Multi-Toilet Ablution Block

₹2,10,000 + GST

SAMAN portable cabin calculator
SAMAN Portable

PRICE IT YOURSELF

Your Multi-Toilet Ablution Block from ₹2,10,000

Set the size, choose the finish, watch the price move as you go.

Start your design

Fixed-price quote within 48 hours. Built in our own works.

Customized cabin

Multi-Toilet Ablution Block

20×10 ft · 200 sq ft

Estimated total

₹2,10,980₹2,48,956 incl. GST

Step 1 of 9

Choose your product

Pick the building closest to what you need. You can change it at any point.

Choose your product

Set the size

Area and price update as you type. Every size prices from our base-cabin rate card; the larger the floor area, the lower the rate per square foot.

Enter a length and width between 4 and 60 ft. For larger buildings, request a quotation and we will size it with you.

Rooms and partitions
Partition doors
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000
Roof
Mobility

Enter any size you need. All sizes price from the same base-cabin rate card, and your figure is confirmed on the drawing.

Frame and wall

Choose what the cabin is built from. The frame carries the load, the wall closes it, and both move the price.

Structural frame
Wall construction

Choose the interior

Standard finishes are included. Upgrades and savings are shown per square foot.

Internal wall lining, per sq ft of wall
Ceiling, per sq ft of floor
Flooring, per sq ft of floor
Wall build-up from outside to inside
Weather skin50
Structural faceMS frame & panel support
Thermal layer50 PUF
Added insulation, per sq ft of wall and ceiling

Add doors and windows

Set the type, the count and where each one sits. The plan updates as you choose.

Door placement

Door 1
Hinge side
Opening
Use "In" when hand flow should remain inside the room edge. Use "Out" when swing clearance is outside.

Window placement

Window 1
Track
Track choice affects how much frame is needed along the edge.
Window 2
Track
Track choice affects how much frame is needed along the edge.

If the entrance sits under a shed or a covered walkway, choose opens in, so rain does not blow through the doorway. On an open site choose opens out, because the door seals tighter against wind. Hinge left and hinge right set which side the handle falls on.

A 2.5 track slides more smoothly and costs more than a 2 track. The difference scales with the size of the window.

Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000

Add electrical fittings

Tick what you need. Quantities are suggested from the floor area and you can change every one.

Light colour
LED shape
Socket placement, no cost impact

Placement moves a socket, it does not add one. The charge is the plug point count above, and moving a socket costs nothing.

Front
Rear
Left
Right
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000

Add furniture and fittings

Everything here is optional. Add only what you want fitted before delivery.

Some fit-out components are being confirmed and show as Quoted separately.

Furniture position

Delivery and taxes

Transport and installation are optional and depend on your site. GST is shown as its own line.

Delivery scope
See the full distance ladder
Delivery freight ladder, ex-GST
Distance20 ft trailer40 ft trailer
Bangalore cityFreeFree
Delhi NCRFreeFree
Under 100 kmConfirmed at quotationConfirmed at quotation
100-150 km₹27,500₹32,500
150-200 km₹32,500₹37,500
200-250 km₹37,500₹42,500
250-300 km₹42,500₹47,500
300-350 km₹47,500₹52,500
350-400 km₹52,500₹57,500
400-450 km₹57,500₹62,500
450-500 km₹62,500₹67,500
500-550 km₹67,500₹72,500
550-600 km₹72,500₹77,500
600-650 km₹77,500₹82,500
650-700 km₹82,500₹87,500
700-750 km₹87,500₹92,500
750-800 km₹92,500₹97,500
800-850 km₹97,500₹1,02,500
850-900 km₹1,02,500₹1,07,500
900-950 km₹1,07,500₹1,12,500
950-1000 km₹1,12,500₹1,17,500

Delivery in 7 to 21 working days. Freight is confirmed once the exact delivery location and order are approved.

Get your quotation

Send us this configuration and we will confirm it with a fixed price within 48 hours.

Submit the exact configuration for a fixed, itemised quotation within 48 hours.

Your contact detailsEnter a 10-digit Indian mobile number.Please add your email so we can send your quotation PDF.

Please add your name and mobile number so our sales team can send your fixed quotation.

Published cabin price tables

All primary prices are ex-GST. Including-GST figures apply 18 percent GST.

Multi-Toilet Ablution Block price table
Multi-Toilet Ablution Block published size and price ladder
SizeAreaPrice ex-GSTIncluding 18% GST
12x10 ft120 sq ft₹2,10,000₹2,47,800
16x10 ft160 sq ft₹2,72,000₹3,20,960
24x12 ft288 sq ft₹4,60,800₹5,43,744
30x12 ft360 sq ft₹5,58,000₹6,58,440
40x12 ft480 sq ft₹6,96,000₹8,21,280
40x20 ft800 sq ft₹10,80,000₹12,74,400
Indicative estimate SP-EST · 24 Aug 2026 · Fixed, itemised quotation within 48 hours of submission.

Product Details

Comprehensive information about Multi-Toilet Ablution Block

Product Overview

Detailed information about Multi-Toilet Ablution Block

What a Multi-Toilet Ablution Block Actually Is

An ablution block is a building whose entire job is water. Every surface in it gets wet, every day, and then gets cleaned with something stronger than water. That single fact separates it from every other structure on a labour camp, and it is why the block is designed from the floor upwards rather than from the walls inwards.

Inside, the block carries repeated banks of WCs, showers and washbasins served from one plumbing manifold, with isolation valves arranged so that a bank can be taken out of service without closing the building. The floor starts as a cement or cement-fibre substrate, takes a waterproof membrane with a perimeter upstand, and falls positively to trapped drains. Walls and ceiling use washable, moisture-tolerant liners with sealed corners. Ventilation runs high, above sightlines, and humid air leaves the building rather than sitting in the roof void.

Buyers usually find this page after single toilet cabins have stopped working for them. That is the honest trigger. A camp of thirty people manages with cabins. A camp of two hundred does not, because the problem stops being sanitation and becomes logistics: too many connections, too many drain runs, too many cleaning stops, and queues that form at whichever units sit nearest the accommodation.

Ablution block connected and in service on a working project site

Choose the Depth Before You Choose the Length

This is the decision that matters most on this page, and it is the one most quotations skip.

Length adds fixtures. Depth changes the plan, and with it the service strategy, the maintenance access and the plot you need.

A 10 ft deep block is single-loaded. One bank of cubicles runs along one serviced wall, and everything behind that wall is pipe. It is the simplest thing to connect, the smallest thing to place and the cheapest per building. Its limitation is structural to the plan rather than to the steel: one isolation point governs the whole block, so a repair closes the facility.

A 12 ft deep block is double-loaded. Two banks face each other across a central pipe duct, and supply and waste serve both sides from one spine. Each side isolates separately. In practice this is the change that makes a camp's sanitation reliable, because maintenance stops being an event that shuts the block and becomes a job done on one half while the other half runs.

A 20 ft deep block adds a dry entry lobby, and enough width for the two sides to be separated and signed independently where the project requires gender separation. It also gives circulation space that stays genuinely dry, which is what keeps the floor safe when a hundred people use the building inside forty minutes.

Work out your depth from how the camp will run, then choose the length from how many people use the block at peak. Doing it the other way round produces a long, shallow building that queues badly and cannot be serviced without closing.

A 10 ft deep single-loaded block beside a 12 ft deep double-loaded block for comparison

Why We Do Not Publish a Seat Count

Every competitor listing we reviewed publishes a fixture count. We do not, and the reason is not caution.

A fixture schedule follows the headcount that actually uses the block at peak, the shift pattern, the gender split, the water pressure available at the plot, the drainage invert you can reach by gravity, and the ratios written into your client's tender and your state's site rules. Two 360 sq ft blocks on two projects can carry materially different schedules and both be correct.

Publishing a number would mean publishing one project's answer as though it were the product's specification. When the tender then asks for something else, the buyer discovers the gap during fabrication rather than during design, and the change is expensive at that point instead of free.

So the block is priced and sold by built-up wet area, and the schedule is set with you before fabrication. What you send us is the peak headcount per block, the shift pattern, the gender split if there is one, your available water pressure and storage, and the level of the drain or tank you expect to connect into. What comes back is a layout with the banks marked and a fixture schedule against it. Approving that drawing on paper costs nothing. Moving a partition after delivery costs time and money.

Interior circulation route with the cubicle bank on one side and the wash run opposite

A Wet Building Is Not a Dry Cabin

The materials are where the difference becomes physical.

The envelope is a nominal 50 mm PUF or PPGI panel, or an MS frame with a moisture-resistant cement, FRP or PVC liner. Cut edges and panel bases are protected from persistent wetting, and absorbent board edges are kept out of floor junctions, shower zones and basin backsplashes, because that is exactly where a dry-cabin build fails first.

Internally the walls take FRP or PVC sheet, glazed or tiled cementitious board, prefinished metal, or another washable moisture-tolerant liner with sealed corners. Ceilings use FRP, PVC, cement board or coated metal, with sealed penetrations. Every one of those choices is made for compatibility with disinfectant and for easy replacement of a damaged panel, not for appearance.

The floor is the part worth reading twice. An 18 to 24 mm cement or cement-fibre board, or a cementitious substrate, carries a waterproof membrane with a perimeter upstand and a positive fall to trapped drains. Membrane continuity is held around pan collars, shower outlets and wall junctions, and wet testing is completed before the final finish wherever the construction method allows it. The finish is safety vinyl, anti-skid ceramic or porcelain tile, an FRP pan, or another approved wet-area surface with sealed coved edges. Falls and thresholds are set so water does not pond and does not run into dry circulation.

Insulation sits behind the wet-side assembly, not in front of it. Closed-cell PUF or PIR class insulation, or a protected mineral-wool system, sits behind the liner with panel cores and edges isolated from direct water. Insulation helps with condensation control, but the waterproofing is delivered by the wet-side assembly and its joints. No insulation product waterproofs a building on its own, and any supplier who implies otherwise is describing a different product.

Humid Air Is What Kills a Cheap Block

Water on the floor is visible and gets dealt with. Water in the air does not, and it is the slower failure.

A block in use is warm and saturated. High-level louvres and frosted openings give natural ventilation while keeping sightlines out, and mechanical exhaust supplements them where the wet load and room volume call for it. Fan quantity and airflow are sized from the cubicle and shower load against the volume of the room, and the exact air-change values are a project decision rather than a number this page invents.

The roof is treated as part of the same system. It is an insulated PPGI or PPGL assembly with a defined slope, gutters and sealed vent and exhaust penetrations, with vapour and condensation treatment matched to your project's climate. Roof drainage is kept separate from sanitary drainage. Humid exhaust discharges to a suitable external location rather than into the roof void, where it would otherwise condense on cold sheet and drip back through the ceiling for the life of the building.

Open service riser showing pipework, isolation valves and the removable access panel

The Services, and Why Access Panels Matter

Supply runs in CPVC or PPR, waste and vent in uPVC, with isolation arranged by bank. WCs, urinals, basins and showers connect per the approved fixture schedule, over floor drains and traps, out to your sewer or holding-tank connection.

The detail that separates a block you can live with from one you cannot is access. Concealed pipe zones get removable access panels rather than permanently trapped valves. Partition framing is coordinated with the plumbing so that valves and traps stay serviceable, and reinforcement is placed at manifold, fixture, door and grab-bar positions rather than fixing hardware to thin liner alone. Where the project requires an accessible cubicle, its supports are structural.

Electrically the block runs FR or FRLS copper in approved conduit or trunking, with penetrations protected and wet-area circuits separated from water and waste routes. Protection is by main isolator with MCB, RCBO or RCCB, with labelled bars, bonding of the steel frame and exposed conductive parts to the tested site earth, and surge protection where the supply or risk assessment calls for it. Final cable sizing follows the connected load, voltage drop and protection coordination on your project's electrical schedule. This page does not certify an installation and no workbook can.

What the Price Covers, and What It Does Not

This is the part most quotations leave vague. We state it plainly, because it is the difference between two quotes that look Rs 2 lakh apart and are not.

Included in the published block price

  • The wet-block enclosure: base frame, floor build-up with membrane and finish, walls, roof, insulation, internal partitions and doors
  • Wet-area lining to walls and ceiling with sealed corners and service access
  • Internal water distribution and drainage rough-in to a single defined interface
  • Internal electrical: wiring in conduit, protection, lighting, fan and exhaust points per the approved schedule
  • Factory quality checks, dimensional inspection, coating repair and dispatch protection

Not included, quoted separately when you need it

  • Water storage tanks, sewage or holding tanks, STP and septic systems
  • Pumps, pressure sets and geysers
  • Accessible fixtures and specialist ventilation beyond the approved schedule
  • External trenching, buried site networks and the sewer or tank connection itself
  • Foundations, plinths, pedestals and site levelling
  • Transport, offloading, positioning and installation
  • Statutory approvals and project-specific structural or performance engineering

A block quoted with a septic system in it has been quoted with a septic system in it. Nothing on this page assumes otherwise. If a competing quotation is materially cheaper, this list is the first place to look for the reason.

Getting the Site Ready

The block arrives as a finished building. What it needs from you is a place to sit and three things to connect to.

  • A level, stable standing with a defined bearing surface, sized with a working margin around the block
  • Access along the service side for its full length, and along both long walls on a 12 ft or 20 ft deep plan
  • A water supply with confirmed pressure and storage adequate for the peak wash period
  • A drain or tank connection at a level the block can reach by gravity, confirmed before fabrication
  • A power supply with a tested site earth
  • Vehicle access and offloading space suited to the size ordered

The drainage level is the one that catches projects out. A block set too low for its outfall cannot be fixed with plumbing after delivery, so confirm the invert level early and tell us what it is.

Cleaning and Maintenance

The block is built to be cleaned hard. The finishes take disinfectant, the corners are sealed, and the drains are trapped and reachable. What it needs in return is ordinary: keep the floor drains clear, keep the exhaust running, check the access panels and isolation valves periodically, and repair any coating damage at cut edges and thresholds before corrosion starts there.

Blocked drains, missed seal and coating maintenance, poor cleaning practice, unauthorised alteration and relocation damage sit outside warranty. SAMAN supplies a 5-year structural warranty and a 1-year finishing warranty as standard, with the finishing warranty extendable to 2 years on request, confirmed at quotation. Design life under proper use and maintenance is 20 to 25 years, which is a design life and not a warranty period.

What to Send Us for a Quotation

  • Peak headcount using the block, and the shift pattern
  • Gender split, if the project requires separation
  • The size you are considering, or the plot you have available
  • Available water pressure and storage, and the drainage or tank level
  • Delivery location, access route and offloading arrangement
  • Any client tender clause or site rule that fixes your fixture ratios

We return a fixed-price quotation within 48 hours, with the layout marked and the fixture schedule against it.

Questions Buyers Actually Ask

Is an ablution block the same as a portable toilet?

No. A portable toilet is a standalone unit planned by ratio and placed where people are working. An ablution block is one building serving a camp population from a shared manifold, with showers and a wash run alongside the WCs.

Can I get a working room in the same building?

Not in this product. Where you need a duty room and a washroom in one shell, the porta cabin with toilet is the right choice; it keeps a dry working room and puts the wet zone inside the same cabin.

Why does the rate per square foot fall as the block grows?

Because the frame, the roof drainage run and the single service entry are shared across more floor area. A larger block reuses one connection point instead of adding another.

Can two blocks be placed together and connected as one?

Yes, and camps commonly phase it that way. Tell us at quotation stage so the service interface and the isolation arrangement are planned for it rather than retrofitted.

Do you supply the septic tank or STP?

Not in the block price. External tanks, STP and septic systems, pumps and site networks are quoted separately.

How long does delivery take?

Delivery is 7 to 21 working days depending on size and schedule, confirmed at order.

Technical Specifications

Detailed technical information and features

Read these two tables as one decision rather than two lists. The first table sets what the building is: the frame that carries wet loads and lifting, and the envelope that has to stay washable and keep water out of insulation and steel. The second sets how it works day to day: the openings that give privacy and airflow, the manifold you will isolate and maintain, and the boundary where SAMAN's supply stops. Where a line says the final value follows the approved drawing, that is not evasion. It means the value is set for your site rather than assumed here.

Structure, Envelope, Floor and Insulation

ComponentMaterial / TypeSpecificationWhat It Changes for the Buyer
Bottom frameLabour-colony structural base / module support frameIS 2062 or approved equivalent MS channel, RHS or formed sections; member sizes and support reactions from the signed structural drawingAnchor position, corrosion access and allowable bearing are frozen before fabrication
Bottom stiffenersSecondary floor and wall support membersRHS, channel or angle stiffeners selected to the approved floor grid, partitions, wet services and relocation dutySpacing is coordinated with board edges, cubicle partitions and openings; site cutting needs approval
Floor frameWet-block floor support frameCorrosion-protected MS, RHS or channel floor grid with local cross-members around WC pans, shower trays, partitions, tanks and service penetrations; slab base where site-builtPenetrations are planned before fabrication so primary members are not cut on site
Top frameUpper perimeter / eave support frameMS RHS or channel, or the documented proprietary upper rail, sized for roof reactions, wall restraint and opening headersTank, solar, exhaust or service-platform reactions are added only after project engineering
Roof stiffenersAblution roof / vent-service framingRHS or formed roof members supporting the insulated PPGI roof, with framed and sealed openings for soil vent stacks, exhaust fans and service entries where specifiedAll penetrations use curbs and flashings and stay maintainable
Corner posts / wallsCubicle and service-wall structural frameMS or RHS external frame plus corrosion-resistant partition supports, reinforced at manifold, fixture, door and grab-bar positionsValves and traps stay serviceable; accessibility supports are structural, not fixed to thin liner
Lifting / handlingApproved lifting, unloading and repositioning provisionsMarked lifting lugs, corner fittings, skid points or transport brackets only where the signed GA and lifting drawing show themThe lift plan sets finished weight, centre of gravity and support points
Welding & fabricationControlled welded and bolted fabricationIS 2062 / IS 1161 class structural steel or approved equivalent; weld sizes, bolt grades and joint details as the fabrication drawingsCertified WPS, PQR and NDT are supplied only where the contract or QA plan specifies them
Exterior wallsWet-area wall envelopeNominal 50 mm PUF/PPGI panel, or MS frame with moisture-resistant cement, FRP or PVC liner; cut edges and panel bases protected from persistent wettingThe assembly is washable and resists splash and cleaning water
RoofInsulated wet-block roofPPGI or PPGL insulated roof with defined slope, gutters and sealed vent and exhaust penetrations; vapour and condensation treatment to project climateRoof drainage is separate from sanitary drainage; humid exhaust discharges outside
Interior wallsSanitary internal wall finishFRP or PVC sheet, glazed or tiled cementitious board, prefinished metal or another washable moisture-tolerant liner with sealed corners and service accessChosen for disinfectant compatibility and easy replacement; concealed pipe zones get access panels
CeilingMoisture-resistant ceilingFRP, PVC, cement board or coated metal with sealed penetrations and access to exhaust, traps or valves where applicableWithstands humidity and cleaning without exposed absorbent surfaces
Floor baseWaterproof ablution floor base18-24 mm cement or cement-fibre board, or RCC / cementitious substrate, with waterproof membrane, perimeter upstand and positive fall to trapped drainsMembrane continuity is held at pan collars, shower outlets and wall junctions; wet testing before final finish where the method allows
Floor finishSlip-resistant sanitary floor finishSafety vinyl, anti-skid ceramic or porcelain tile, FRP pan or approved wet-area finish with sealed coved and upstand edgesFalls and thresholds prevent ponding into dry circulation
Wall insulationMoisture-protected wall insulationClosed-cell PUF or PIR class, or protected mineral-wool system behind a wet-area liner; cores and edges isolated from direct waterHelps condensation control; waterproofing comes from the wet-side assembly, not the insulation
Roof insulationRoof insulation and condensation controlInsulated roof panel or approved vapour-controlled insulation with a mechanically or naturally ventilated wet spaceWhole-roof thermal claims require the exact assembly
External interfacesWater, sewer and cleaning interfacesSingle or multiple water inlet, manifold isolation, sewer or holding-tank outlet, vent termination, cleaning hose point, external signage and service access per the approved schematicTanks, pumps, STP, septic and buried networks stay separate unless quoted
Fasteners & sealingWeather, wet-service and panel-joint sealing systemCorrosion-compatible fasteners, EPDM washers, butyl or PU sealants, closures, flashing, sleeves and isolation tapes matched to the selected build-upJoints drain outward, stay cleanable and allow maintenance; field drilling is deburred and resealed

Openings, Services, Layout, Finish and Handover

ComponentMaterial / TypeSpecificationWhat It Changes for the Buyer
Cubicle and service doorsPrivacy cubicle and service doorsCorrosion-resistant cubicle doors and partitions plus an external entrance or service door; privacy latch, ventilation gap and durable wet-area hardwareClearances preserve cleaning and emergency assistance; accessible cubicles follow project-required openings
Windows / service openingHigh-level privacy ventilation openingsHigh-level louvres or frosted windows with insect protection, plus mechanical exhaust openings sized to wet load and privacy requirementOpenings avoid direct sightlines while supporting airflow
Grills / mosquito meshSecurity grille, insect screen and privacy accessoriesRemovable mesh, louvres, restrictors, privacy screens or protected MS grilles only where room use and the approved opening schedule requireVentilation, cleaning access and emergency escape are maintained
Electrical wiringCopper wiring and labelled containmentTypical references 1.5 sq mm lighting, 2.5 sq mm sockets, 4 sq mm high-load; final sizing follows connected load, voltage drop and protection coordinationFR/FRLS copper in conduit, separated from water and waste routes
Electrical protectionDistribution, residual-current protection and earthingMain isolator, MCB / RCBO or RCCB protection, labelled neutral and earth bars, bonding, surge protection where requiredFrame and exposed conductive parts bond to the tested site earth; this workbook does not certify the installation
Electrical fittingsFixed lights, fans, sockets and service pointsLED luminaires, fan points, 6A/16A sockets, exhaust points and emergency lighting only in the quantities on the approved scheduleLoose appliances, AC units and DG or UPS equipment are excluded unless itemised
VentilationContinuous wet-area exhaust strategyNatural high-level ventilation supplemented by exhaust fans and ducts as needed; quantity and airflow sized from cubicle and shower load against room volumeAir-change values and controls are project decisions, not workbook values
Plumbing / sanitaryMulti-fixture plumbing manifoldCPVC or PPR supply, uPVC soil, waste and vent, isolation by bank, WCs, urinals, basins and showers per the fixture schedule, floor drains, traps and external sewer or holding-tank connectionFixture count is not inferred from area; tender and applicable site rules set ratios, gender split and storage
Layout / configurationAblution bank and maintenance layoutRepeated toilet, shower and basin banks with dry entry, privacy segregation, central or service-side pipe access and cleaning circulation; accessible cubicle where the project requires itResolves headcount, shifts, gender, pressure, drainage level and maintenance access; distinct from a single attached-toilet cabin
Painting / coatingCorrosion protection and external finishPrepared carbon steel with compatible primer and top coats, or galvanized / pre-painted sheet with repaired cut edges; upgraded for coastal, industrial or wet-service exposureSkid undersides, roof drains, cut edges and wet thresholds govern field durability
Quality checksFactory and site QA and handover evidenceDimensional, member, weld and bolt, coating, panel, roof-drainage, opening, electrical and plumbing checks plus wet-test checksHandover evidence identifies the approved GA, BOM, test records and maintenance points
WarrantyContract-controlled warranty and maintenance obligationsPeriod, start date, remedy, relocation conditions, consumables and exclusions exactly as the signed quotation and handover documents stateSite foundations, utilities, misuse, blocked drains and missed maintenance remain excluded unless expressly covered
Ablution block bank layout diagram showing the central pipe duct, dry entry and cleaning circulation
Illustrative - not for construction unless approved.
Wet-service section diagram showing floor fall to a trapped drain, vent stack and exhaust discharge
Illustrative - not for construction unless approved.

Shipping & Delivery

Freight tables and delivery terms

Every SAMAN cabin is delivered factory-direct from our Bengaluru (South) or Greater Noida (North) unit on an open trailer, with delivery and installation across South and North India in 7–21 working days. Cabins up to 20 ft travel on a 20 ft open trailer; 30 ft and 40 ft cabins travel on a 40 ft open trailer. Unloading by crane or manual placement is arranged based on your site access and confirmed at quotation.

Free delivery: within Bangalore city (South zone) · Delhi NCR: Ghaziabad, Gurugram, Faridabad, Noida and Greater Noida (North zone).

20 ft open trailer · freight by distance (both zones)

DistanceFreight (Rs)
100–150 km25,000–30,000
150–200 km30,000–35,000
200–250 km35,000–40,000
250–300 km40,000–45,000
300–350 km45,000–50,000
350–400 km50,000–55,000
400–450 km55,000–60,000
450–500 km60,000–65,000
500–550 km65,000–70,000
550–600 km70,000–75,000
600–650 km75,000–80,000
650–700 km80,000–85,000
700–750 km85,000–90,000
750–800 km90,000–95,000
800–850 km95,000–100,000
850–900 km100,000–105,000
900–950 km105,000–110,000
950–1,000 km110,000–115,000

40 ft open trailer · freight by distance (both zones)

DistanceFreight (Rs)
100–150 km30,000–35,000
150–200 km35,000–40,000
200–250 km40,000–45,000
250–300 km45,000–50,000
300–350 km50,000–55,000
350–400 km55,000–60,000
400–450 km60,000–65,000
450–500 km65,000–70,000
500–550 km70,000–75,000
550–600 km75,000–80,000
600–650 km80,000–85,000
650–700 km85,000–90,000
700–750 km90,000–95,000
750–800 km95,000–100,000
800–850 km100,000–105,000
850–900 km110,000–115,000
900–950 km115,000–120,000
950–1,000 km120,000–125,000

Typical destinations from our Bengaluru unit (South zone)

approximate road distance, find your freight band in the tables above; final charge confirmed at quotation

CityApprox. distanceFreight band
Mysuru~145 km100–150 km
Salem~215 km200–250 km
Tirupati~250 km250–300 km
Mangaluru~350 km300–350 km
Chennai~350 km300–350 km
Coimbatore~365 km350–400 km
Hubballi~410 km400–450 km
Madurai~435 km400–450 km
Kochi~550 km500–550 km
Goa (Panaji)~560 km550–600 km
Hyderabad~570 km550–600 km
Vijayawada~630 km600–650 km

Typical destinations from our Greater Noida unit (North zone)

approximate road distance, find your freight band in the tables above; final charge confirmed at quotation

CityApprox. distanceFreight band
Agra~165 km150–200 km
Haridwar~230 km200–250 km
Jaipur~255 km250–300 km
Dehradun~285 km250–300 km
Chandigarh~290 km250–300 km
Gwalior~330 km300–350 km
Ludhiana~390 km350–400 km
Kanpur~440 km400–450 km
Lucknow~470 km450–500 km
Amritsar~490 km450–500 km
Bhopal~600 km550–600 km
Varanasi~760 km750–800 km

Distances beyond 1,000 km are quoted at booking. ODC (over-dimensional cargo) charges depend on the state. All freight figures are tentative, the final charge is confirmed once your delivery location and order are confirmed, and may vary slightly with the route and return-vehicle availability.

Customer Reviews

0 reviews

No reviews yet. Be the first to review this product.

Write a Review for Multi-Toilet Ablution Block

Your email is not published.

Reviews are published after approval by our team.

Built by a verified manufacturer: ISO 9001:2015 certified, Udyam registered, NSIC-enlisted, GST registered.

View manufacturer credentials