Labour Sheds for Site Workers: One Open Sleeping Hall

Choose your size — six factory-built options

20x30 ft Labour Sheds

Price on request — send enquiry

A labour shed is one undivided sleeping hall under a single roof. There are no rooms inside, no corridor and no false ceiling, so a project gets the highest bed count from the smallest footprint and the simplest build. SAMAN makes it as a light steel portal frame clad in pre-painted steel sheet, with a continuous louvre band under the eaves and a ridge ventilator above, so air moves across the hall without relying on air conditioning. Six published sizes run from 20x10 ft to 20x40 ft. Sanitation, drinking water and cooking always sit in separate structures. Choose the shed when the crew is large, the duration is defined and shared sleeping space is acceptable.

Build
Single-storey light steel portal frame, PPGI cladding, RCC slab or hardstanding
Published sizes
20x10, 20x15, 20x20, 20x25, 20x30 and 20x40 ft (200 to 800 sq ft)
Hall
One undivided sleeping hall, no internal partitions, no false ceiling
Ventilation
Continuous high-level louvre band plus ridge ventilator, no AC as standard
Indicative rate
Rs 1,150 down to Rs 680 per sq ft by size, ex-GST, supply only

Custom sizes available · 500+ projects delivered · Factory-tested before dispatch

Download Specification PDF

GST registered · ISO 9001:2015 certified manufacturer · 5-year structural and 1-year finishing warranty · Pan-India delivery

Why an Open Hall Beats a Room Block for Large Site Crews

The decision is not really about the building. It is about whether your workforce can share one sleeping space. An open hall puts every bunk under one roof with one aisle, which is why it costs less per bed and goes up faster than any partitioned option. Nothing inside is spent on walls, doors or corridors, and the money saved goes into the frame, the floor and the ventilation. The trade you accept is privacy: there is no lockable room anywhere in the hall.

If the crew needs lockable rooms, supervisor privacy or family accommodation, the shed is the wrong product and a partitioned block is the right one. That is a real fork in the road, so compare the two before you price either, because switching later means rebuilding rather than adapting. Our labour hutments page covers the room-block route. When you know which one fits, send us your crew size and site details and we will quote it.

Single-storey labour shed with an open door showing bunk beds inside and a continuous louvre band

Shed or Room Block: How to Decide Quickly

Answer one question first. Can the crew sleep in shared, undivided space for the length of this project? If yes, the shed is cheaper per bed and quicker to erect.

  • Shed: highest bed density, lowest cost per bed
  • Shed: one hall, one aisle, distributed exits
  • Room block: lockable rooms, supervisor and family use
  • Both: sanitation stays in a separate structure
Get a quote for your crew
20x30 ft labour shed in pearl-grey cladding, front-left view, with a ridge ventilator along the apex

20x30 ft Labour Shed: 600 sq ft With a Door at Each End

Thirty feet gives a full-length central aisle running door to door, which is the cleanest circulation this product achieves. Air enters through the louvre band along both walls, crosses the bunks and leaves at the ridge without anything blocking the path. It is the size we use as the reference plan on the technical drawing, because at 30 ft every control the shed depends on is visible in a single view.

20x30 ft600 sq ftPrice on request

20x30 ft Labour Sheds

Price on request

SAMAN portable cabin calculator
SAMAN Portable

PRICE IT YOURSELF

Design your Labour Sheds

Set the size, choose the finish, watch the price move as you go.

Start your design

Fixed-price quote within 48 hours. Built in our own works.

Customized cabin

Labour Sheds

20x10 ft · quantity 1

Estimated total

Price on requestFixed quotation within 48 hours

Step 1 of 9

Choose your product

Pick the building closest to what you need. You can change it at any point.

Choose your product

Set the size

Area and price update as you type. Every size prices from our base-cabin rate card; the larger the floor area, the lower the rate per square foot.

Enter the worker headcount to see the smallest sufficient configuration and quantity.

Approved building configuration

Enter any size you need. All sizes price from the same base-cabin rate card, and your figure is confirmed on the drawing.

Frame and wall

Choose what the cabin is built from. The frame carries the load, the wall closes it, and both move the price.

Structural frame
Wall construction

Choose the interior

Standard finishes are included. Upgrades and savings are shown per square foot.

Internal wall lining, per sq ft of wall
Ceiling, per sq ft of floor
Flooring, per sq ft of floor
Wall build-up from outside to inside
Weather skin50
Structural faceMS frame & panel support
Thermal layer50 PUF
Added insulation, per sq ft of wall and ceiling

Add doors and windows

Set the type, the count and where each one sits. The plan updates as you choose.

Colony buildings are configured as complete blocks. Doors, windows, electrical points and fittings follow the approved building drawing for the configuration you select, and any change you need is itemised in your fixed quotation.

Add electrical fittings

Tick what you need. Quantities are suggested from the floor area and you can change every one.

Quantities are quotation items per building.

Light colour
LED shape
Socket placement, no cost impact

Placement moves a socket, it does not add one. The charge is the plug point count above, and moving a socket costs nothing.

Front
Rear
Left
Right
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin priceQuoted separately

Add furniture and fittings

Everything here is optional. Add only what you want fitted before delivery.

Some fit-out components are being confirmed and show as Quoted separately.

Furniture position

Delivery and taxes

Transport and installation are optional and depend on your site. GST is shown as its own line.

Delivery scope
See the full distance ladder
Delivery freight ladder, ex-GST
Distance20 ft trailer40 ft trailer
Bangalore cityFreeFree
Delhi NCRFreeFree
Under 100 kmConfirmed at quotationConfirmed at quotation
100-150 km₹27,500₹32,500
150-200 km₹32,500₹37,500
200-250 km₹37,500₹42,500
250-300 km₹42,500₹47,500
300-350 km₹47,500₹52,500
350-400 km₹52,500₹57,500
400-450 km₹57,500₹62,500
450-500 km₹62,500₹67,500
500-550 km₹67,500₹72,500
550-600 km₹72,500₹77,500
600-650 km₹77,500₹82,500
650-700 km₹82,500₹87,500
700-750 km₹87,500₹92,500
750-800 km₹92,500₹97,500
800-850 km₹97,500₹1,02,500
850-900 km₹1,02,500₹1,07,500
900-950 km₹1,07,500₹1,12,500
950-1000 km₹1,12,500₹1,17,500

Delivery in 7 to 21 working days. Freight is confirmed once the exact delivery location and order are approved.

Get your quotation

Send us this configuration and we will confirm it with a fixed price within 48 hours.

Submit the exact configuration for a fixed, itemised quotation within 48 hours.

Your contact detailsEnter a 10-digit Indian mobile number.Please add your email so we can send your quotation PDF.

Please add your name and mobile number so our sales team can send your fixed quotation.

Published cabin price tables

All primary prices are ex-GST. Including-GST figures apply 18 percent GST.

Labour Sheds price table
Labour Sheds published size and price ladder
SizeAreaWorkers housedPrice ex-GSTIncluding 18% GST
20x10 ft200 sq ftprice on requestitemised in quotation
20x15 ft300 sq ftprice on requestitemised in quotation
20x20 ft400 sq ftprice on requestitemised in quotation
20x25 ft500 sq ftprice on requestitemised in quotation
20x30 ft600 sq ftprice on requestitemised in quotation
20x40 ft800 sq ftprice on requestitemised in quotation
Indicative estimate SP-EST · 24 Aug 2026 · Fixed, itemised quotation within 48 hours of submission.

Product Details

Comprehensive information about Labour Sheds

Product Overview

Detailed information about Labour Sheds

What a labour shed actually is

A labour shed is the simplest form of worker accommodation SAMAN builds. It is one hall, one roof, one floor and one aisle. Bunks stand in rows against the walls and nothing divides the space between them. That single design decision drives everything else about the product: the cost per bed, the speed of erection, the way air moves through it, and the kind of workforce it suits.

The word shed causes confusion in India, so it is worth being precise. A garden shed stores tools. An industrial shed covers a factory floor. A labour shed houses people. They share a name and a roof profile and almost nothing else. If you are looking for a covered workshop or a warehouse, our industrial sheds range is the right place. This page is about sleeping accommodation for a site workforce.

The shed sits inside a family of worker housing. The labour colony is the whole settlement: several buildings, sanitation, kitchen, circulation, drainage and lighting planned together. A shed is one building inside that settlement. So is a hutment. So is a camp module. If you are planning the whole compound, start at the colony page. If you already know you need sleeping capacity and are choosing the building type, stay here.

The open hall, and what it costs you

Everything good about a shed and everything difficult about it comes from the same thing: there are no rooms.

With no partitions, the full width of the building is available for beds and circulation. There is no corridor eating floor area, no repeated door and frame, no repeated wall build-up, no ceiling. A given square foot of shed therefore carries more beds than the same square foot of partitioned block, and it costs less to build because there is less in it.

The erection sequence is also shorter. A portal frame goes up on a prepared slab, purlins and roof sheeting follow, wall cladding and the louvre band go on, then doors, electrics and fixed fans. There is no internal partition trade, no door schedule of any size, no ceiling grid. On a site where accommodation is on the critical path, that difference is measured in days.

What you give up is privacy and acoustic separation. Everyone in the hall shares the same volume of air and the same noise. Shift workers sleeping during the day will hear the hall. There is nowhere to lock a bag away from everyone else except a personal locker. For a lot of Indian project workforces this is normal and acceptable. For supervisory staff, for mixed crews, or where a client contract specifies room-based accommodation, it is not, and you should be looking at a partitioned block instead.

That is genuinely the whole decision. Everything below is about executing it well.

Ventilation is the design problem, not a feature

A room block distributes people into small volumes with their own windows. A shed concentrates them into one large volume. Get the air wrong and a shed becomes uncomfortable long before it becomes unsafe, and uncomfortable accommodation empties out.

SAMAN's approach on the shed is deliberate and it is visible in the building. A continuous louvre band runs along both long walls just under the eaves, above head height and above the top bunk. A ridge ventilator runs along the roof apex. Air enters low and along the length rather than through a handful of punched windows, crosses the hall, warms, rises, and leaves at the ridge. Nothing above bunk level is allowed to block that path, which is why the standard shed has no false ceiling and why any ceiling added later has to preserve the ridge airflow.

Fixed wall or ceiling fans assist the movement. What the standard shed does not do is treat split air conditioning as the answer. Cooling a single large volume full of people is expensive to run and expensive to power, and on most project sites the power is not there. Where climate or occupancy density genuinely demands it, insulated wall or roof panels are available as an upgrade, and mechanical assistance can be added after a heat and moisture review. Neither is a standard inclusion and neither replaces ventilation.

There is a practical detail worth knowing about ridge ventilation: rain. A ridge opening has to be baffled and flashed so that driving rain does not enter, rather than sealed up to stop leaks. Sealing a ridge vent solves a wet patch and creates a hot building. If a shed you are inspecting has a taped-over ridge, that is a maintenance failure, not a design choice.

The structure, plainly

The shed is a light steel portal frame. Columns sit on base plates anchored to the slab, rafters span the width, and C or Z purlins carry the roof. Frame spacing is chosen from the shed width, the cladding, wind actions and the foundation reactions. Members are IS 2062 class structural steel or approved equivalent, with sizes and connections coming from the signed structural drawing rather than from any published table. Nothing on this page is a member schedule.

Walls and roof are pre-painted profiled steel sheet, with the louvre band integrated into the wall build-up rather than cut into it afterwards. A gutter runs along each eave with downpipes at the ends, and roof laps, ridge details and flashings are detailed to drain outward.

The floor is the part buyers most often under-plan. The standard shed sits on an RCC slab or a designed hardstanding, not on a ply platform. Dense bed rows and daily wet cleaning destroy board floors and hide their joints. A slab also gives you level, damp control and a surface that takes a cleaning trolley. Getting the slab poured, level and drained before the frame arrives is the single biggest thing a site can do to keep the erection on programme.

Coating follows the exposure. Galvanised or pre-painted sheet with cut edges made good is the baseline; coastal, industrial and wet-service locations get an upgraded system. The coating schedule records preparation, product, coat sequence, colour and the repair method, because in practice it is cut edges, gutter lines and hidden crevices that decide how the building looks in year five.

Exits, aisles and why length matters more than width

Bunks must never block a door. That sounds obvious and it is the most common defect in site-built accommodation.

Because a shed is one volume, travel distance to an exit grows with the length of the hall rather than with its area. This is why our published sizes change their door arrangement as they get longer rather than simply getting bigger: one door on the smallest, a second door near the mid-point at 25 ft, doors at both ends at 30 ft, and three distributed doors at 40 ft. Aisles stay clear and door swings and landings are kept free of beds and lockers.

Final exit count, exit width, aisle clearance and travel distance come from the approved project drawing and from whatever local requirements apply to your site. They are not inferred from floor area, and this page does not publish them as fixed numbers.

Two bunk rows facing a wide central concrete aisle inside a labour shed, with ceiling fans above

What is inside, and what is not

The shed is supplied as a ventilated, lit, powered enclosure with a durable floor. Standard scope covers the structure, the cladding and roof, the louvre band and ridge ventilator, gutters and downpipes, the doors, and fixed lighting, fan points and sockets in the quantities shown on the approved electrical schedule.

Bunks, mattresses and lockers are quoted separately. So are the slab or hardstanding, foundations, site levelling, drainage, external walkways and lighting, water supply, and the sanitation block. Fire systems, large-span structural redesign and statutory approvals are separate. Insulated wall or roof panels are an upgrade rather than an inclusion.

Sanitation deserves its own sentence, because it is the most common misunderstanding about this product. Toilets, showers and wash areas do not go inside the sleeping hall. Soil and waste networks are not run through it. Sanitation lives in a separate block reached from the walkway outside, and drinking water points sit outside the hall as well. That is a hygiene decision, not a cost-saving one, and it is fixed.

What it costs, honestly

SAMAN does not publish a fixed price per shed size, because span, floor build-up, insulation, electrical density, exit count and site conditions all move the number and a fixed table would be misleading.

What we can publish is the rate scale, ex-GST and supply only:

Shed floor areaIndicative rate per sq ft
100 to 500 sq ftRs 1,150 falling to Rs 1,000
500 to 1,000 sq ftRs 1,000 falling to Rs 850
1,000 to 1,500 sq ftRs 850 falling to Rs 750
1,500 to 2,000 sq ftRs 750 falling to Rs 680

The rate falls as the shed grows, and the reason is worth understanding before you compare quotations. A shed carries a fixed set of costs that barely change with size: the end frames, the doors, the gutters and downpipes, the electrical distribution, the transport mobilisation, the erection setup. Spread those over 200 sq ft and they are heavy. Spread them over 800 sq ft and they are light. This is why a small shed looks expensive per square foot and a large one looks cheap, and why building one 20x40 shed costs less than building two 20x20 sheds for the same beds.

It also explains where the shed stops. Below about 100 sq ft the fixed costs dominate so completely that a shed is the wrong purchase, and an insulated PUF porta cabin gives you a better building for similar money. Above 2,000 sq ft the frame needs a wider clear span with heavier sections, and the building is engineered and quoted individually rather than taken from a scale.

Two things to check on any comparison quotation, ours included: what the floor is, and what the ventilation is. Those two items separate a shed that works in an Indian summer from one that does not, and they are the two most commonly stripped out to win a price.

Site-built shed or engineered shed

Most labour sheds in India are still built on site from whatever is to hand: casuarina or bamboo poles, a light timber frame, GI sheet nailed over it, sometimes a tarpaulin layer. They go up in a few days, they cost very little, and for a short package on a small site they are a reasonable answer. It is worth being honest that this is the real competition for a factory-made shed, not another manufacturer.

The differences show up over time rather than on day one. A pole-and-sheet shed has no engineered frame, so wind performance is whatever the carpenter judged. It has no gutter, so water runs off the eave and undermines the ground the poles stand in. It usually has punched openings rather than a continuous louvre band, so the air moves in patches. The floor is normally the ground itself or a thin screed, which cannot be washed properly. And it cannot be taken down and reused, so at the end of the package it is waste rather than an asset.

An engineered shed costs more up front and earns that back in three ways: it survives a monsoon and a second project, it can be dismantled and relocated, and it gives the client something defensible when accommodation standards are audited. If your project runs under a year on one site and nobody is auditing, a site-built shed may genuinely be the better commercial call. If it runs longer, moves, or is subject to a client accommodation standard, it is not.

Service life and maintenance

A SAMAN shed is designed for a service life of 20 to 25 years under proper use and maintenance. That is a design life, not a warranty period, and it assumes the building is looked after.

Maintenance on a shed is short and mostly about water and air. Clear the gutters and downpipes before each monsoon. Check the ridge ventilator flashing rather than sealing it. Make good any cut edges or coating damage on the cladding, because cut edges and gutter lines are where corrosion starts. Keep the louvre band clear of stored material, dust and nesting. Wash the floor rather than letting it soak. Check door hinges and closers, since these take the heaviest use in the whole building.

Site foundations, utilities, misuse, unauthorised alteration, poor cleaning, blocked drains, missed sealing or coating maintenance and relocation damage sit outside warranty cover unless expressly included. The warranty period, start date, remedy and exclusions are exactly as stated in the signed quotation and handover documents.

Getting a useful quotation

Send us six things and the quote comes back accurate rather than indicative: the site location, the number of people to be housed, how long the accommodation is needed, whether the slab is already there or in scope, the power supply available, and any client or contract requirement on accommodation standards. Tell us if the shed has to be relocated later, because that changes the floor and the connection detail.

We manufacture at Bengaluru and Greater Noida and supply across India, so delivery route and distance affect the freight component. The Shipping tab shows the current freight bands.

Send your requirement and get a quotation.

Technical Specifications

Detailed technical information and features

Two numbers on this page change what a shed costs and how it performs, and neither is obvious from a photograph. The first is the floor: an RCC slab rather than a board platform is what lets a hall take dense bed rows and daily wet cleaning for years. The second is the ventilation build-up: a continuous louvre band integrated into the wall, working with a ridge ventilator, is what keeps a single large volume habitable without power. When you compare quotations line by line, compare those two first.

Table 1

ComponentDetail
Bottom frameIS 2062 or approved equivalent MS channel, RHS or formed sections; member sizes and support reactions from the signed structural drawing
Bottom stiffenersRHS, channel or angle stiffeners set to the approved floor grid, bunk positions and relocation duty
Floor frameRCC slab or designed hardstanding preferred; factory floor cassette only on smaller relocatable formats
Frame and wallsBolted or welded MS portal or truss system with side rails and bracing; clear span larger than a hutment module
Top frameMS RHS or channel upper rail sized for roof reactions, wall restraint and opening headers
Roof structureLight portal or truss frame with C, Z or RHS purlins; single or double slope PPGI roof with ridge or turbo ventilators and gutters
Exterior wallsPPGI or GI sheet with robust lower liner and a continuous high-level ventilation band; insulated panel where climate or noise requires
RoofProfiled PPGI with defined overlap, ridge and eave details, gutters and downpipes; optional insulated underlay or panel
Interior wallsPainted or galvanised sheet, or durable low-wall liner; no decorative partition lining in the standard open dormitory
CeilingNo false ceiling as baseline; exposed insulated roof underside or simple liner where justified, preserving ridge airflow
Floor baseRCC slab or specified industrial floor on prepared subgrade; no generic marine-ply platform on the standard shed
Floor finishPower-trowelled or sealed concrete, epoxy or PVC, selected from project duration and cleaning regime
Welding and fabricationIS 2062 / IS 1161 class steel or approved equivalent; weld sizes, bolt grades and joint details per fabrication drawings
Painting and coatingPrepared carbon steel with compatible primer and top coats, or galvanised sheet with repaired cut edges; upgraded for coastal, industrial or wet exposure

Table 2

ComponentDetail
Wall insulationOptional PUF or sandwich-panel upgrade, or insulated liner, where climate or occupancy requires; GI tier may remain uninsulated with the ventilation strategy
Roof insulationOptional insulated roof panel, reflective underlay or mineral or glass-wool class layer compatible with ridge ventilation
Doors and exitsPersonnel doors distributed along the hall per approved occupancy, travel path and local requirements; robust MS or insulated doors as scheduled
Windows and openingsContinuous or repeated high-level louvres on the long elevations, protected end openings, insect mesh and security features where required
Grilles and meshRemovable mosquito mesh, louvres, restrictors or protected MS grilles only where the approved opening schedule requires
VentilationHigh-volume natural and fan ventilation: cross ventilation, ridge or stack exhaust, ceiling or wall fans, optional evaporative or mechanical assist. Split AC is not the default for a large open dormitory
Electrical wiringFR or FRLS copper in approved conduit or trunking; typical references 1.5 sq mm lighting, 2.5 sq mm socket, 4 sq mm high-load; final sizing per the project electrical schedule
Electrical protectionMain isolator, MCB, RCBO or RCCB protection, labelled neutral and earth bars, bonding and surge protection per the supply and risk assessment
Electrical fittingsLED luminaires, fan points, 6A and 16A sockets, exhaust and emergency lighting only in the quantities on the approved schedule
Plumbing and sanitaryExternalised. Soil and waste networks remain in a separate sanitation block rather than running through the sleeping hall
Layout and configurationOpen dormitory bed-hall plan: parallel bunk rows, central or dual aisles, distributed exits, cross ventilation, separate common sanitation block
Lifting and handlingMarked lifting lugs, skid points or transport brackets only where the signed GA and lifting drawing show them; one-piece lifting is not assumed for a site-assembled shed
Fasteners and sealingCorrosion-compatible fasteners, EPDM washers, butyl or PU sealants, closures and flashings matched to the selected build-up
Quality checksDimensional, member, weld and bolt, coating, panel, roof-drainage, opening, electrical and plumbing checks, plus handover evidence
Excluded from supplyBunks, mattresses, lockers, slab and foundations, site levelling, drainage, external walkways and lighting, water supply, sanitation block, fire systems, statutory approvals, large-span structural redesign
WarrantyPeriod, start date, remedy, relocation conditions and exclusions exactly as stated in the signed quotation and handover documents
Open dormitory shed plan for the 20x30 ft labour shed with dimensions, aisle and exit positions
Illustrative - not for construction unless approved
Structural section of a 20 ft clear-span labour shed showing eave, ridge and ventilation controls
Illustrative - not for construction unless approved

Shipping & Delivery

Freight tables and delivery terms

Every SAMAN cabin is delivered factory-direct from our Bengaluru (South) or Greater Noida (North) unit on an open trailer, with delivery and installation across South and North India in 7–21 working days. Cabins up to 20 ft travel on a 20 ft open trailer; 30 ft and 40 ft cabins travel on a 40 ft open trailer. Unloading by crane or manual placement is arranged based on your site access and confirmed at quotation.

Free delivery: within Bangalore city (South zone) · Delhi NCR: Ghaziabad, Gurugram, Faridabad, Noida and Greater Noida (North zone).

20 ft open trailer · freight by distance (both zones)

DistanceFreight (Rs)
100–150 km25,000–30,000
150–200 km30,000–35,000
200–250 km35,000–40,000
250–300 km40,000–45,000
300–350 km45,000–50,000
350–400 km50,000–55,000
400–450 km55,000–60,000
450–500 km60,000–65,000
500–550 km65,000–70,000
550–600 km70,000–75,000
600–650 km75,000–80,000
650–700 km80,000–85,000
700–750 km85,000–90,000
750–800 km90,000–95,000
800–850 km95,000–100,000
850–900 km100,000–105,000
900–950 km105,000–110,000
950–1,000 km110,000–115,000

40 ft open trailer · freight by distance (both zones)

DistanceFreight (Rs)
100–150 km30,000–35,000
150–200 km35,000–40,000
200–250 km40,000–45,000
250–300 km45,000–50,000
300–350 km50,000–55,000
350–400 km55,000–60,000
400–450 km60,000–65,000
450–500 km65,000–70,000
500–550 km70,000–75,000
550–600 km75,000–80,000
600–650 km80,000–85,000
650–700 km85,000–90,000
700–750 km90,000–95,000
750–800 km95,000–100,000
800–850 km100,000–105,000
850–900 km110,000–115,000
900–950 km115,000–120,000
950–1,000 km120,000–125,000

Typical destinations from our Bengaluru unit (South zone)

approximate road distance, find your freight band in the tables above; final charge confirmed at quotation

CityApprox. distanceFreight band
Mysuru~145 km100–150 km
Salem~215 km200–250 km
Tirupati~250 km250–300 km
Mangaluru~350 km300–350 km
Chennai~350 km300–350 km
Coimbatore~365 km350–400 km
Hubballi~410 km400–450 km
Madurai~435 km400–450 km
Kochi~550 km500–550 km
Goa (Panaji)~560 km550–600 km
Hyderabad~570 km550–600 km
Vijayawada~630 km600–650 km

Typical destinations from our Greater Noida unit (North zone)

approximate road distance, find your freight band in the tables above; final charge confirmed at quotation

CityApprox. distanceFreight band
Agra~165 km150–200 km
Haridwar~230 km200–250 km
Jaipur~255 km250–300 km
Dehradun~285 km250–300 km
Chandigarh~290 km250–300 km
Gwalior~330 km300–350 km
Ludhiana~390 km350–400 km
Kanpur~440 km400–450 km
Lucknow~470 km450–500 km
Amritsar~490 km450–500 km
Bhopal~600 km550–600 km
Varanasi~760 km750–800 km

Distances beyond 1,000 km are quoted at booking. ODC (over-dimensional cargo) charges depend on the state. All freight figures are tentative, the final charge is confirmed once your delivery location and order are confirmed, and may vary slightly with the route and return-vehicle availability.

Customer Reviews

0 reviews

No reviews yet. Be the first to review this product.

Write a Review for Labour Sheds

Your email is not published.

Reviews are published after approval by our team.

Built by a verified manufacturer: ISO 9001:2015 certified, Udyam registered, NSIC-enlisted, GST registered.

View manufacturer credentials