Peb Steel Structure
1 / 5

Bangalore & South Zone

Delhi NCR & North Zone

Peb Steel Structure

₹4,725,000

Inclusive of all taxes

PEB steel structure
120×30×20 ft, IS-2062 certified steel
Factory-fabricated steel frame — designed, built, and erected by SAMAN to IS 2062. Clear-span building for factories, warehouses, and logistics.
Size / Capacity
120×30×20 ft · 3,600 sq ft
Frame / Panel
IS 2062 steel · PUF panel
Price / Delivery
Rs 47,25,000 · 30–45 days
FloorLoad / Relocations
Clear-span · Relocatable
Turnkey · IS-code documents
Rs 47,25,000

Product Information

SKU:SP-120-PSS-2024

Customized cabin

Porta Cabin

20×10 ft · 200 sq ft

Estimated total

₹2,10,980₹2,48,956 incl. GSTThis is a general cabin estimate. It does not price the product on this page.

Step 1 of 9

Choose your product

Pick the building closest to what you need. You can change it at any point.

Choose your product

Set the size

Area and price update as you type. Every size prices from our base-cabin rate card — the larger the floor area, the lower the rate per square foot.

Enter a length and width between 4 and 60 ft. For larger buildings, request a quotation and we will size it with you.

Rooms and partitions
Partition doors
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000
Roof
Mobility

Enter any size you need. All sizes price from the same base-cabin rate card, and your figure is confirmed on the drawing.

Frame and wall

Choose what the cabin is built from. The frame carries the load, the wall closes it, and both move the price.

Structural frame
Wall construction

Choose the interior

Standard finishes are included. Upgrades and savings are shown per square foot.

Internal wall lining, per sq ft of wall
Ceiling, per sq ft of floor
Flooring, per sq ft of floor
Wall build-up from outside to inside
Weather skin50
Structural faceMS frame & panel support
Thermal layer50 PUF
Added insulation, per sq ft of wall and ceiling

Add doors and windows

Set the type, the count and where each one sits. The plan updates as you choose.

Door placement

Door 1
Hinge side
Opening
Use "In" when hand flow should remain inside the room edge. Use "Out" when swing clearance is outside.

Window placement

Window 1
Track
Track choice affects how much frame is needed along the edge.
Window 2
Track
Track choice affects how much frame is needed along the edge.

If the entrance sits under a shed or a covered walkway, choose opens in, so rain does not blow through the doorway. On an open site choose opens out, because the door seals tighter against wind. Hinge left and hinge right set which side the handle falls on.

A 2.5 track slides more smoothly and costs more than a 2 track. The difference scales with the size of the window.

Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000

Add electrical fittings

Tick what you need. Quantities are suggested from the floor area and you can change every one.

Light colour
LED shape
Socket placement, no cost impact

Placement moves a socket, it does not add one. The charge is the plug point count above, and moving a socket costs nothing.

Front
Rear
Left
Right
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000

Add furniture and fittings

Everything here is optional. Add only what you want fitted before delivery.

Some fit-out components are being confirmed and show as Quoted separately.

Furniture position

Delivery and taxes

Transport and installation are optional and depend on your site. GST is shown as its own line.

Delivery scope
See the full distance ladder
Delivery freight ladder, ex-GST
Distance20 ft trailer40 ft trailer
Bangalore cityFreeFree
Delhi NCRFreeFree
Under 100 kmConfirmed at quotationConfirmed at quotation
100-150 km₹27,500₹32,500
150-200 km₹32,500₹37,500
200-250 km₹37,500₹42,500
250-300 km₹42,500₹47,500
300-350 km₹47,500₹52,500
350-400 km₹52,500₹57,500
400-450 km₹57,500₹62,500
450-500 km₹62,500₹67,500
500-550 km₹67,500₹72,500
550-600 km₹72,500₹77,500
600-650 km₹77,500₹82,500
650-700 km₹82,500₹87,500
700-750 km₹87,500₹92,500
750-800 km₹92,500₹97,500
800-850 km₹97,500₹1,02,500
850-900 km₹1,02,500₹1,07,500
900-950 km₹1,07,500₹1,12,500
950-1000 km₹1,12,500₹1,17,500

Delivery in 7 to 21 working days. Freight is confirmed once the exact delivery location and order are approved.

Get your quotation

Send us this configuration and we will confirm it with a fixed price within 48 hours.

Submit the exact configuration for a fixed, itemised quotation within 48 hours.

Your contact detailsEnter a 10-digit Indian mobile number.Please add your email so we can send your quotation PDF.

Please add your name and mobile number so our sales team can send your fixed quotation.

Published cabin price tables

All primary prices are ex-GST. Including-GST figures apply 18 percent GST.

Porta Cabin price table
Porta Cabin published size and price ladder
SizeAreaPrice ex-GSTIncluding 18% GST
10x10 ft100 sq ft₹1,43,750₹1,69,625
20x8 ft160 sq ft₹2,20,000₹2,59,600
20x10 ft200 sq ft₹2,50,000₹2,95,000
20x12 ft240 sq ft₹2,88,000₹3,39,840
30x10 ft300 sq ft₹3,60,000₹4,24,800
40x10 ft400 sq ft₹4,75,000₹5,60,500
Indicative estimate SP-EST · 24 Aug 2026 · Fixed, itemised quotation within 48 hours of submission.

Product Details

Comprehensive information about Peb Steel Structure

Product Overview

Detailed information about Peb Steel Structure

What a PEB Steel Structure Is

A PEB steel structure is the pre-engineered steel skeleton of an industrial building, built-up I-section columns and rafters forming the primary frame, with cold-formed Z and C purlins as the secondary members. Fabricated to IS 2062 in a controlled factory and bolted together on site, it spans far wider than reinforced concrete at a fraction of the weight, which is why factories, warehouses, and logistics sheds across India are built this way.

A completed steel-grey PEB steel structure on an Indian industrial plot under clear sky.

A finished PEB steel structure on an industrial estate, factory-fabricated frame, erected on a concrete apron.

What SAMAN delivers is not loose steel. We design the frame to your loads, fabricate every member in our own facility, and erect the completed structure on your site, so the grade in the drawing is the grade that gets bolted up.

The Steel Inside: Grades, Sections, and Why They're Chosen

The strength of a steel PEB structure comes down to two decisions: what grade of steel goes into it, and which section type carries which load. Both follow Bureau of Indian Standards practice.

Primary members, the columns and rafters that carry the building, are built-up I-sections welded from steel plate conforming to IS 2062, usually grade E250 or E350 (the number is the minimum yield strength in MPa). E250 is sufficient for lighter spans such as a standard warehouse; E350 is specified where loads are heavier, as in a production plant or a high-wind, high-seismic site. Secondary members, the purlins and girts that the roof and wall cladding fasten to, are cold-formed Z and C sections, lighter steel shaped to span between frames without adding dead weight.

Bare red-oxide primer steel portal frames of a PEB being erected, purlins fixed across the top.

Built-up I-section primary frames in red-oxide primer with Z-purlin secondaries, the IS-2062 steel skeleton before cladding.

Member group Section & grade Structural role
Primary frame (columns, rafters) Built-up welded I-section, IS 2062 E250 / E350 Carries the full building load to foundation
Secondary frame (purlins, girts) Cold-formed Z & C, galvanised steel Spans between frames; holds roof and wall cladding
Connections HSFG bolts + shop welds Joins members; transfers load at every node

How those members join matters as much as the steel itself. The primary connections, rafter to column, column to base plate, are made with high-strength friction-grip (HSFG) bolts, while the heavy plate-to-plate joints inside a built-up section are shop-welded under controlled conditions before the member ever leaves the factory. Welding in the factory rather than on site is what holds tolerances tight: members arrive pre-drilled and match-marked, so the on-site work is bolting to a plan, not cutting and adjusting in the field. That is also why erection is fast. A structure of this size bolts up in days, not weeks.

Getting this allocation right is what keeps a PEB steel frame building light and economical without giving up load capacity. Over-specifying grade everywhere inflates cost, while under-specifying a primary member is a structural risk.

Coatings and Corrosion Protection: How Long the Steel Lasts

Steel only lasts as long as its protection against moisture. Every primary member we fabricate is shot-blasted and given a shop primer coat, with an epoxy or PU top coat available for coastal and chemically aggressive sites. The roof and wall cladding is galvalume or colour-coated profiled sheet, conforming to IS 277 for galvanised sheet and IS 14246 for pre-painted galvanised sheet, in the 0.47–0.55 mm thickness range that balances weight against durability.

Pure-white galvalume profiled steel sheeting being fixed to the purlins of a PEB steel structure.

Galvalume colour-coated sheeting fixed to purlins. The coated cladding that protects the steel for 25-plus years.

The coating decision is driven by where the building stands. An inland, dry-climate site, most of interior South India, the Deccan, the northern plains, is well served by a standard red-oxide primer with a single top coat. A coastal or high-humidity site within roughly 20 km of the sea, or a plant handling salts, fertilisers, or chemicals, needs a heavier system: hot-dip galvanising or a zinc-rich epoxy primer under a PU top coat, because chloride-laden air attacks ordinary primer far faster. Specifying the coastal system inland wastes money; specifying the inland system on the coast shortens the life of the steel. Tell us the site and we specify the system to match it.

Specified and coated correctly, the steel carries a 25-year-plus design life with minimal maintenance. Comparable to the structure of any permanent building, and well ahead of what an uncoated or thinly-coated shed will hold up to. For buyers who need a simpler, smaller single-span enclosure rather than a full engineered frame, a basic single-span industrial shed is the lower-spec alternative.

What a 120 × 30 × 20 ft PEB Steel Structure Costs

A SAMAN PEB steel structure measuring 120 × 30 × 20 ft, a 3,600 sq ft clear-span building, designed, fabricated, and erected, is priced at Rs 47,25,000, which works out to roughly Rs 1,312 per sq ft. That figure covers structural design to IS code, factory fabrication of all primary and secondary members, IS-certified PEB steel with documentation, transport, and erection by our own crew. It is not a steel-supply rate; it is the cost of a finished, standing structure.

Completed 120×30 ft navy-trimmed PEB steel structure with a truck and worker for scale.

The 120×30×20 ft PEB steel structure complete, truck and worker show the 3,600 sq ft clear-span scale.

Two things move the number on a custom span: the steel grade your loads demand, and the clear span itself. Grade is straightforward. An E350 heavy-duty frame costs more than an E250 light frame for the same footprint. Span is less obvious but matters more: a wider clear span means the primary rafter has to carry load across a longer unsupported distance, so its built-up section gets deeper and heavier. Widening a building from a 30 ft span to a 50 ft span does not just add 20 ft of width. It steps up the section depth of every primary frame across the whole length, which is why a wider building costs more per square foot, not less. Knowing your true required clear span before you quote is the single biggest lever on the steel cost. For the full per-sq-ft range across building sizes and use cases, see our turnkey PEB construction service at the hub.

Verifying the Steel, and Who Builds It

The one document that protects a PEB buyer is the Material Test Certificate. An MTC traces each batch of steel back to the mill and confirms its grade and chemistry against IS 2062. Ask for it on every order, and keep it with your IS-compliance file for building approval. Every SAMAN structure ships with its MTC and IS-code structural documentation as standard.

Erection crew bolting a grey steel frame connection with a mobile crane lifting a rafter behind.

SAMAN's own crew bolting the primary frame, single-contract design, fabrication and erection.

SAMAN designs, fabricates, and erects the complete structure, one accountable entity from drawing to handover. If instead you have your own erection contractor and only need the steel pre-engineered and supplied to your specification, that is sourced as a product rather than a service; our pre-engineered buildings range is built for exactly that. Choose the erected structure here when you want a single point of accountability through to a standing building.

Frequently Asked Questions

What grade of steel is used in PEB?
Primary members are built-up I-sections fabricated from IS 2062 plate, grade E250 or E350 (some specifications use ASTM A572-50 / Grade 345 equivalents). E250 suits lighter warehouse-type spans; E350 is used for heavy-duty industrial loads. Secondary Z and C purlins are cold-formed from galvanised steel. Every grade is confirmed by Material Test Certificate.

What is the difference between PEB and RCC?
A PEB is a factory-fabricated steel frame bolted together on site; RCC is reinforced concrete cast in place. PEB is far faster to build, spans much wider without internal columns, weighs a fraction as much (lighter foundations), and can be dismantled and relocated. RCC suits multi-storey load-bearing work; for large single-storey clear-span industrial buildings, steel is usually faster and lighter.

How much does a PEB steel structure cost?
A 120 × 30 × 20 ft SAMAN structure (3,600 sq ft) is Rs 47,25,000, about Rs 1,312 per sq ft, including design, fabrication, IS-certified steel, transport, and site erection. Steel grade and clear span are the main cost drivers on a custom size.

Do you supply the steel only, or build the whole structure?
We design, fabricate, and erect the complete structure as a service, one contract through to a standing building. If you need only the steel supplied to your own erection team, see our pre-engineered buildings range, which is set up for product supply.

Get a Structural Quote

Tell us your required clear span, length, eaves height, intended use, and site location. We will respond with a preliminary structural brief and an itemised cost estimate within 24 hours.

Bangalore, Call +91 80886 85440 · WhatsApp +91 88616 22859
Delhi NCR, Call +91 87960 39938 · WhatsApp +91 97089 89937

Certifications and Manufacturer Credentials

SAMAN POS India Private Limited (POS = Portable Office Solutions) has designed, fabricated and erected steel structures since 2009 (incorporated 2019), with 500+ projects delivered across India from our plants at Gopasandra, Bengaluru 560099 and Greater Noida (Vill Jalpura, Tehsil Dadri, Greater Noida, Gautambudha Nagar, Uttar Pradesh 201308). Certifications and registrations: ISO 9001:2015 (Cert No. E20250218645), ISO 14001:2015 (Cert No. E20250218646), ISO 45001:2018 (Cert No. E20250218647), NSIC enlisted (Ref. NSIC/GP/BAN/2024/0055207), DPIIT-recognised startup (Ref. DIPP56005), Udyam registered (UDYAM-KR-03-0172770), GST 29ABBCS7101B1ZR (Bangalore) and 09ABBCS7101B1ZT (Noida). Structural steel to IS 2062. Explore the full PEB construction range.

Customer Reviews

0 reviews

No reviews yet. Be the first to review this product.

Write a Review for Peb Steel Structure

Your email is not published.

Reviews are published after approval by our team.

Built by a verified manufacturer: ISO 9001:2015 certified, Udyam registered, NSIC-enlisted, GST registered.

View manufacturer credentials