Prefabricated Steel Building
1 / 5

Bangalore & South Zone

Delhi NCR & North Zone

Prefabricated Steel Building

₹3,525,000

Inclusive of all taxes

Factory-fabricated 90×36×14 ft IS-certified steel building, engineered to your structural spec.
Size
90×36×14 ft
Capacity
3,240 sq ft
Frame
IS 2062 steel
Panel
Insulated + roof sheet
Price
₹35,25,000
Delivery
Made to order
Floor
Steel & wood deck
Relocations
Bolted, re-erectable
Bangalore · Delhi NCR
₹35,25,000

Product Information

SKU:SP-90-PSB-2024

Explore the Range

Related products

Customized cabin

Porta Cabin

20×10 ft · 200 sq ft

Estimated total

₹2,50,000₹2,95,000 incl. GSTThis is a general cabin estimate. It does not price the product on this page.

Step 1 of 9

Choose your product

Pick the building closest to what you need. You can change it at any point.

Choose your product

Set the size

Area and price update as you type. Every size prices from our base-cabin rate card; the larger the floor area, the lower the rate per square foot.

Enter a length and width between 4 and 60 ft. For larger buildings, request a quotation and we will size it with you.

Rooms and partitions
Partition doors
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,50,000
Roof
Mobility

Enter any size you need. All sizes price from the same base-cabin rate card, and your figure is confirmed on the drawing.

Frame and wall

Choose what the cabin is built from. The frame carries the load, the wall closes it, and both move the price.

Structural frame
Wall construction

Choose the interior

Standard finishes are included. Upgrades and savings are shown per square foot.

Internal wall lining, per sq ft of wall
Ceiling, per sq ft of floor
Flooring, per sq ft of floor
Wall build-up from outside to inside
Weather skin50
Structural faceMS frame & panel support
Thermal layer50 PUF
Added insulation, per sq ft of wall and ceiling

Add doors and windows

Set the type, the count and where each one sits. The plan updates as you choose.

Door placement

Door 1
Hinge side
Opening
Use "In" when hand flow should remain inside the room edge. Use "Out" when swing clearance is outside.

Window placement

Window 1
Track
Track choice affects how much frame is needed along the edge.
Window 2
Track
Track choice affects how much frame is needed along the edge.

If the entrance sits under a shed or a covered walkway, choose opens in, so rain does not blow through the doorway. On an open site choose opens out, because the door seals tighter against wind. Hinge left and hinge right set which side the handle falls on.

A 2.5 track slides more smoothly and costs more than a 2 track. The difference scales with the size of the window.

Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,50,000

Add electrical fittings

Tick what you need. Quantities are suggested from the floor area and you can change every one.

Light colour
LED shape
Socket placement, no cost impact

Placement moves a socket, it does not add one. The charge is the plug point count above, and moving a socket costs nothing.

Front
Rear
Left
Right
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,50,000

Add furniture and fittings

Everything here is optional. Add only what you want fitted before delivery.

Some fit-out components are being confirmed and show as Quoted separately.

Furniture position

Delivery and taxes

Transport and installation are optional and depend on your site. GST is shown as its own line.

Delivery scope
See the full distance ladder
Delivery freight ladder, ex-GST. Freight figures are tentative and confirmed with the delivery quotation.
Distance20 ft trailer40 ft trailer
Bangalore cityFreeFree
Delhi NCRFreeFree
Under 100 kmConfirmed at quotationConfirmed at quotation
100-150 km₹27,500₹32,500
150-200 km₹32,500₹37,500
200-250 km₹37,500₹42,500
250-300 km₹42,500₹47,500
300-350 km₹47,500₹52,500
350-400 km₹52,500₹57,500
400-450 km₹57,500₹62,500
450-500 km₹62,500₹67,500
500-550 km₹67,500₹72,500
550-600 km₹72,500₹77,500
600-650 km₹77,500₹82,500
650-700 km₹82,500₹87,500
700-750 km₹87,500₹92,500
750-800 km₹92,500₹97,500
800-850 km₹97,500₹1,02,500
850-900 km₹1,02,500₹1,12,500
900-950 km₹1,07,500₹1,17,500
950-1000 km₹1,12,500₹1,22,500

Delivery in 7 to 21 working days. Freight is confirmed once the exact delivery location and order are approved.

Get your quotation

We aim to send your fixed-price quotation within 48 business hours after receiving complete dimensions, specifications, delivery PIN code and scope. Complex engineered configurations may require additional time, which we will confirm.

Submit the exact configuration for an itemised quotation. Custom quote target: 48 business hours.

Your contact detailsEnter a 10-digit Indian mobile number.Please add your email so we can send your quotation PDF.

Please add your name and mobile number so our sales team can send your fixed quotation.

Published cabin price tables

All primary prices are ex-GST. Including-GST figures apply 18 percent GST.

Porta Cabin price table
Porta Cabin published size and price ladder
SizeAreaPrice ex-GSTIncluding 18% GST
10x10 ft100 sq ft₹1,43,750₹1,69,625
20x8 ft160 sq ft₹2,20,000₹2,59,600
20x10 ft200 sq ft₹2,50,000₹2,95,000
20x12 ft240 sq ft₹2,88,000₹3,39,840
30x10 ft300 sq ft₹3,60,000₹4,24,800
40x10 ft400 sq ft₹4,75,000₹5,60,500
Indicative estimate SP-EST · 09 Sept 2026 · Custom quote target: 48 business hours after submission.

Product Details

Comprehensive information about Prefabricated Steel Building

Product Overview

Detailed information about Prefabricated Steel Building

A prefabricated steel building from SAMAN is a factory-fabricated structural steel building engineered and priced to your project, the standard reference build is 90 × 36 × 14 ft (3,240 sq ft) at ₹35,25,000, with steel grade, span, eave height and cladding fixed to your structural brief before fabrication begins. It sits inside SAMAN's wider prefab building range, and it is the variant to specify when the structure itself, not a ready-made interior, is the decision you are making.

What Defines a Prefabricated Steel Building?

A prefabricated steel building is a structure whose load-bearing frame, columns, rafters and bracing, is fabricated from IS-grade structural steel in a factory, then bolted together on a prepared foundation and enclosed with panel cladding. The steel frame carries the load, and the specification is engineered before fabrication rather than improvised on site.

Charcoal-grey prefabricated steel building with a green steel roof on an industrial estate road.

A prefabricated steel building in charcoal-grey cladding sited on an Indian industrial estate.

That factory-first sequence is what separates it from poured RCC and from a welded-on-site shed. Drawings are approved, sections are cut and the frame is fabricated as a kit; site work becomes assembly, not construction. Because the load path runs through the steel, the building can span wide, column-free areas and carry roof and wind loads that a masonry structure of the same speed could not.

The 90 × 36 × 14 ft Configuration: What ₹35,25,000 Covers

At ₹35,25,000 for 3,240 sq ft, the reference build works out to roughly ₹1,088 per square foot for the delivered, installed structure. That figure includes the structural steel frame (IS 2062 columns, rafters and bracing for a 90 ft length, 36 ft width and 14 ft eave height), insulated wall panel cladding and steel roof sheeting, a structural floor deck in steel and wood, and transport plus on-site bolted assembly.

Steel-blue prefabricated steel building, 90 by 36 ft, on a levelled plot with a roller shutter.

The 90×36×14 ft reference build in steel-blue cladding with a roller shutter and personnel door.

This is the configuration to quote from, not a fixed ceiling. Wider spans, a taller eave, heavier cladding or added floor area each change the build, which is why prefabricated steel buildings prices are quoted per configuration rather than as a single rate. The 90 × 36 × 14 ft build (SKU SP-CC-40-2024) is the reference point your quote scales up or down from.

Steel Grade, Span and Cladding: How the Build Scales to Your Spec

The frame is fabricated from IS 2062 structural steel, with section sizes set to the clear span, eave height and the wind-and-load zone of your site. Because SAMAN is the prefabricated steel buildings manufacturer and not a reseller, those grades and sections are specified and sourced in-house, and the same building can be supplied as a single clear-span block or as a prefabricated modular steel building made of repeatable bays. Cladding and roof sheeting are matched to use, insulated panel where interior climate matters, plain profile sheeting where it does not, and the frame is rated for a design life of 30 years or more.

The span you need usually decides the rest:

Erected clear-span structural steel frame of a prefabricated steel building with partial charcoal cladding.

Clear-span IS-grade steel frame being clad on site, columns, rafters and cross bracing.

Building scale Typical use When to step up
Single-bay clear span (to ~36 ft wide) Workshop, store, single-block office or showroom Width or column-free area exceeds one span
Multi-bay frame Warehouse, plant floor, large commercial block Add bays to extend footprint; raise the eave for cranes or high racking
Multi-storey steel frame Stacked offices, mixed-use commercial Site is tight and floor area must go up, not out

For a heavy plant or storage footprint where the structure is purely industrial, a dedicated industrial steel structure may be the closer match; for office, showroom or institutional use the same frame is finished to a higher interior standard.

Foundation, Bolted Assembly and Relocation: the Site Reality

A prefabricated steel building sits on a concrete plinth, with anchor bolts set to SAMAN's layout drawing before the frame arrives. Assembly on site is bolted, columns to base plates, rafters to columns, bracing across, with no site welding, so a weather-tight shell goes up in weeks where conventional construction takes months. Standard fabrication, delivery and installation in India runs to a defined lead time confirmed at order, against your foundation readiness.

Grey steel column base plate bolted with anchor bolts to a concrete plinth on site.

Bolted column base on a concrete plinth, the no-weld site assembly of a steel building.

Because every connection is bolted rather than cast, the building is not a one-site structure. It can be unbolted, separated and re-erected at a new location without structural damage, which is what makes a steel frame worth specifying when a site may change over a 20- to 25-year life.

Prefabricated Steel Building or Steel Prefab Building: Matching One to Your Project

Beige prefabricated steel building used as a commercial unit with a glazed entrance and paved forecourt.

A prefabricated steel building in sandstone-beige finished as a commercial unit with a glazed entrance.

SAMAN sells the same material under two product pages because they answer two different briefs. Choose this page, the prefabricated steel building, when the structure is the decision: IS-grade steel to a stated spec, a custom span and eave height, multi-bay or multi-storey capability, and a frame designed to your load and wind zone. Move to our finished multi-room steel building when you want a set layout, a fixed price and a fast turnaround. An office block, clinic or showroom delivered as rooms rather than engineered to a structural brief. Same steel; different starting point.

Frequently Asked Questions

What grade of steel do you use, and is it IS-certified?

The frame uses IS 2062 structural steel, with column and rafter sections sized to your span, eave height and the wind-and-load zone of the site. Material and section sizes are specified in-house and confirmed on the structural drawing before fabrication.

How much does a prefabricated steel building cost, and what changes the price?

The reference 90 × 36 × 14 ft building is ₹35,25,000, about ₹1,088 per sq ft installed. Price moves with clear span, eave height, cladding type and total floor area, so each configuration is quoted on its own spec rather than a flat rate.

Prefabricated steel building or steel prefab building: which do I need?

Choose the prefabricated steel building when you are specifying the structure, IS-grade steel, custom span, multi-bay or multi-storey. Choose the finished steel prefab building when you want a fixed multi-room layout at a set price and a quick turnaround.

What foundation does it need, and can it be relocated later?

It sits on a concrete plinth with anchor bolts set to the layout drawing. Assembly is fully bolted with no site welding, so the building can be dismantled and re-erected at a new site without structural damage.

Get a Quote

Send your span, eave height and intended use, and SAMAN will quote the configuration and lead time. Manufacturing in Bangalore and Delhi NCR.

Bangalore, Call +91 80886 85440 · WhatsApp +91 88616 22859
Delhi NCR, Call +91 87960 39938 · WhatsApp +91 97089 89937

Certifications and Manufacturer Credentials

SAMAN POS India Private Limited (POS = Portable Office Solutions) has manufactured steel structures since 2009 (incorporated 2019), with 500+ projects across India from our plants at Gopasandra, Bengaluru 560099 and Greater Noida (Vill Jalpura, Tehsil Dadri, Greater Noida, Gautambudha Nagar, Uttar Pradesh 201308). Certifications and registrations: ISO 9001:2015 (Cert No. E20250218645), ISO 14001:2015 (Cert No. E20250218646), ISO 45001:2018 (Cert No. E20250218647), NSIC enlisted (Ref. NSIC/GP/BAN/2024/0055207), DPIIT-recognised startup (Ref. DIPP56005), Udyam registered (UDYAM-KR-03-0172770), GST 29ABBCS7101B1ZR (Bangalore) and 09ABBCS7101B1ZT (Noida). Structural steel to IS 2062. Explore the full prefab buildings range.

Customer Reviews

0 reviews

No reviews yet. Be the first to review this product.

Write a Review for Prefabricated Steel Building

Your email is not published.

Reviews are published after approval by our team.

Built by a verified manufacturer: ISO 9001:2015 certified, Udyam registered, NSIC-enlisted, GST registered.

View manufacturer credentials