Flat-Pack Container Office: Six Sizes, 80 to 800 Sq Ft

Choose your size - six factory-built options

10 x 8 ft Flat-Pack Container Office

₹1,91,520 + GST

₹2,25,994 incl. 18% GST

A flat-pack container office arrives as parts rather than as a finished room. A floor cassette, corner posts, a roof cassette and insulated wall panels reach your site, and a crew bolts them together there. Nothing is welded in the working position.

SAMAN publishes six sizes, from an 80 sq ft cabin seating four up to an 800 sq ft office with rooms and toilets. The rate starts at Rs 1,900 per sq ft ex-GST at the 200 sq ft reference. Choose this build when a finished module cannot reach the spot you want, when the office must come apart and go up again. Or when you need 800 sq ft from parts a normal truck can carry. Foundations, transport and site assembly are quoted separately.

Published sizesSix, 10x8 ft to 40x20 ft, 80 to 800 sq ft
Rate at the 200 sq ft referenceRs 1,900 per sq ft ex-GST, budgetary
How it is builtBolted cassettes and panels, no welding on site
Envelope50 to 75 mm insulated sandwich panels, coated steel faces
Outside the published priceFoundations, transport, unloading, site assembly

Custom sizes available · 500+ projects delivered · Factory-tested before dispatch

Product Information

Download Specification PDF

When a flat-pack office beats a module that arrives finished

Most steel offices leave our works as one welded box and set down wherever the crane can reach. That is the cheaper way to buy, and for a compound that never changes it is the right way. This build answers a different problem. Because the parts travel separately, the office can go up inside a plant, behind a gate no trailer can clear. Or 800 sq ft wide where no vehicle could carry a finished floor.

The trade is money against reach. You pay more per square foot here than for a welded container office cabin. This is because bolted joints, reusable seals and a factory trial fit-up all cost more than one welded shell. What you buy back is the site a finished module cannot enter, and an office you can take down and raise again. Send us the access route, the working position and the headcount, and we will tell you which of the two builds you actually need.

Send your site access details and get a project quote
Interior of a flat-pack container office with two desks, three chairs, overhead cabinets and two sliding windows

A Kit on the Truck, a Finished Office on Site

Flat-pack describes how the office travels, not what you end up with. The panels, the wiring and the finishes are the same ones we fit to a welded module.

  • Insulated sandwich panels with coated steel faces, not sheeting
  • Prewired lights, sockets and switches in replaceable service panels
  • Commercial vinyl or SPC floor laid over a board deck
  • Doors and windows arrive glazed and sealed in their frames
Ask what the finished office includes
General arrangement board for the compact flat-pack office showing plan, elevations and opening schedule

10 x 8 ft Flat-Pack Office Seating Four in 80 Sq Ft

At 80 sq ft this is the smallest office we publish, and it seats four. That density works only because the desks run around three walls with nothing in the middle. One door opens on the long wall, and the other three walls each carry a window, so every seat gets daylight. Treat it as a four-person watch room or a gate office rather than a room you can walk about in. It carries the highest rate in the ladder, because a small building still needs a full set of cassettes.

  • One external door on Wall A, and no door on any other wall
  • Three windows, one on the long wall and one centred on each end
  • Four workstations: two on the long wall, one on each end wall
  • Rs 1,91,520 ex-GST, Rs 2,25,994 with GST at 18 per cent
  • Rs 2,394 per sq ft, the sub-100 sq ft band rate
10 x 8 x 8.5 ft80 sq ft₹1,91,520 + GSTRs 2,394 per sq ft/sq ft

10 x 8 ft Flat-Pack Container Office

₹1,91,520 + GST

Long red flat-pack container office with four sliding windows standing on a concrete yard
SAMAN Portable

PRICE IT YOURSELF

Your Flat-Pack Container Office from Rs 1,91,520

Set the size, choose the finish, watch the price move as you go.

Start your design

Fixed-price quote within 48 hours. Built in our own works.

Customized cabin

Flat-Pack Container Office

20×10 ft · 200 sq ft

Estimated total

₹2,10,980₹2,48,956 incl. GST

Step 1 of 9

Choose your product

Pick the building closest to what you need. You can change it at any point.

Choose your product

Set the size

Area and price update as you type. Every size prices from our base-cabin rate card; the larger the floor area, the lower the rate per square foot.

Enter a length and width between 4 and 60 ft. For larger buildings, request a quotation and we will size it with you.

Rooms and partitions
Partition doors
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000
Roof
Mobility

Enter any size you need. All sizes price from the same base-cabin rate card, and your figure is confirmed on the drawing.

Frame and wall

Choose what the cabin is built from. The frame carries the load, the wall closes it, and both move the price.

Structural frame
Wall construction

Choose the interior

Standard finishes are included. Upgrades and savings are shown per square foot.

Internal wall lining, per sq ft of wall
Ceiling, per sq ft of floor
Flooring, per sq ft of floor
Wall build-up from outside to inside
Weather skin50
Structural faceMS frame & panel support
Thermal layer50 PUF
Added insulation, per sq ft of wall and ceiling

Add doors and windows

Set the type, the count and where each one sits. The plan updates as you choose.

Door placement

Door 1
Hinge side
Opening
Use "In" when hand flow should remain inside the room edge. Use "Out" when swing clearance is outside.

Window placement

Window 1
Track
Track choice affects how much frame is needed along the edge.
Window 2
Track
Track choice affects how much frame is needed along the edge.

If the entrance sits under a shed or a covered walkway, choose opens in, so rain does not blow through the doorway. On an open site choose opens out, because the door seals tighter against wind. Hinge left and hinge right set which side the handle falls on.

A 2.5 track slides more smoothly and costs more than a 2 track. The difference scales with the size of the window.

Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000

Add electrical fittings

Tick what you need. Quantities are suggested from the floor area and you can change every one.

Light colour
LED shape
Socket placement, no cost impact

Placement moves a socket, it does not add one. The charge is the plug point count above, and moving a socket costs nothing.

Front
Rear
Left
Right
Drawing view
D1W1W220' 0"10' 0"2D Plan

R = room · D = door · W = window

On the drawing, R1 is Room 1, D1 is Door 1 and W1 is Window 1. Every control and every line of your quotation uses the full words.

Carpet Area200 sq ft
Base cabin price₹2,00,000

Add furniture and fittings

Everything here is optional. Add only what you want fitted before delivery.

Some fit-out components are being confirmed and show as Quoted separately.

Furniture position

Delivery and taxes

Transport and installation are optional and depend on your site. GST is shown as its own line.

Delivery scope
See the full distance ladder
Delivery freight ladder, ex-GST
Distance20 ft trailer40 ft trailer
Bangalore cityFreeFree
Delhi NCRFreeFree
Under 100 kmConfirmed at quotationConfirmed at quotation
100-150 km₹27,500₹32,500
150-200 km₹32,500₹37,500
200-250 km₹37,500₹42,500
250-300 km₹42,500₹47,500
300-350 km₹47,500₹52,500
350-400 km₹52,500₹57,500
400-450 km₹57,500₹62,500
450-500 km₹62,500₹67,500
500-550 km₹67,500₹72,500
550-600 km₹72,500₹77,500
600-650 km₹77,500₹82,500
650-700 km₹82,500₹87,500
700-750 km₹87,500₹92,500
750-800 km₹92,500₹97,500
800-850 km₹97,500₹1,02,500
850-900 km₹1,02,500₹1,07,500
900-950 km₹1,07,500₹1,12,500
950-1000 km₹1,12,500₹1,17,500

Delivery in 7 to 21 working days. Freight is confirmed once the exact delivery location and order are approved.

Get your quotation

Send us this configuration and we will confirm it with a fixed price within 48 hours.

Submit the exact configuration for a fixed, itemised quotation within 48 hours.

Your contact detailsEnter a 10-digit Indian mobile number.Please add your email so we can send your quotation PDF.

Please add your name and mobile number so our sales team can send your fixed quotation.

Published cabin price tables

All primary prices are ex-GST. Including-GST figures apply 18 percent GST.

Container Office price table
Container Office published size and price ladder
SizeAreaPrice ex-GSTIncluding 18% GST
10 x 8 ft80 sq ft₹1,91,520₹2,25,994
20 x 8 ft160 sq ft₹3,34,400₹3,94,592
20 x 10 ft200 sq ft₹3,80,000₹4,48,400
30 x 10 ft300 sq ft₹5,47,200₹6,45,696
40 x 10 ft400 sq ft₹7,22,000₹8,51,960
40 x 20 ft800 sq ft₹13,83,200₹16,32,176
Indicative estimate SP-EST · 01 Sept 2026 · Fixed, itemised quotation within 48 hours of submission.

You may also like

Product Details

Comprehensive information about Flat-Pack Container Office

Product Overview

Detailed information about Flat-Pack Container Office

What actually turns up on the truck

A flat-pack order does not arrive as an office. It arrives as a floor cassette, corner posts and panel rails, a roof cassette or bolted purlin set, and insulated wall panels. The doors and windows are already glazed and sealed in their frames. Fasteners, gaskets and sealants come as a named list rather than as a loose bag.

Each part is marked for its place on the assembly drawing, and that marking is the whole job. A numbered panel goes into one bay and no other. This is because its edges, its receiving channels and its service routes were cut to match that bay. Swap two panels and the wiring no longer reaches. Our pack list names every component and every quantity, and a crew checks it against the delivery before anything is lifted.

The parts are protected differently from a finished module. A welded office rides one trailer and uses its own skin as packaging. Meanwhile, cassettes and panels have exposed edges, coated faces and bolt holes that all have to reach you undamaged. So the packs are restrained, stacked to a set height, and kept clear of the ground until the crew needs them.

Welded in the works, bolted on your site

Welding still happens, but it happens in the factory. The base cassette, the roof cassette and the subassemblies are welded on a jig, checked for square, and only then galvanized or painted. Cut edges get their coating repaired before the parts leave, so what reaches your site is a set of finished, protected pieces.

On site the connections are dry. Posts bolt to the base and the roof through captive plates, and panels slide into receiving channels and clamp onto gaskets. Nothing is welded in the working position unless a project engineer has designed that joint. We avoid it, because site welding burns the coating and removes the reason you bought this build.

Why the rate sits above a welded cabin

Beige flat pack container office exterior with one door, two sliding windows and an end window in a paved yard

Buyers ask why a building that ships in pieces costs more than one that ships whole. It is a fair question, and the answer is not clever. A bolted building carries far more connections than a welded one. Every connection is a machined face, a captive plate, a bolt and a gasket. The parts also have to survive handling that a sealed box never sees.

There is a second cost that never shows on a drawing. Cassettes are trial assembled or jig checked in the works before dispatch. This is because a bolt hole that does not line up is cheap to fix here. On a site four hundred kilometres away it is expensive. That check sits inside this rate and is not part of a welded cabin's cost.

So compare the two honestly. At the same 200 sq ft reference this build is Rs 1,900 per sq ft ex-GST. Meanwhile the cluster's welded value line publishes Rs 1,250 per sq ft at that reference and the hub range sits between the two. You are paying roughly half as much again for reach and for reuse. If neither matters on your project, buy the welded module and spend the difference on the fit-out.

BuildRate at 200 sq ft, ex-GSTWhat you are buying
Flat-Pack Container Office, this pageRs 1,900 per sq ftParts that reach a site a module cannot, and an office that comes apart
Container Offices hub rangeRs 1,450 per sq ftThe standard fabricated module, delivered whole
Container Office CabinRs 1,250 per sq ftThe welded value line, for a unit that stays put

Sibling rates are quoted with their basis stated: each is that page's own published figure at the same 200 sq ft reference, read from the live page on 24 August 2026. All are budgetary.

What the site has to be before the first panel lands

Level, reach and room to work

One thing decides whether an assembly goes well, and it is the base. A welded module lands on its own frame and bridges small errors in the ground, but a bolted building cannot. If the supports are out of level, the base cassette twists as the bolts pull up, the posts lean. The panels stop meeting their channels squarely. Doors then bind and gaskets stop sealing.

So the supports go in first, and they go in level. Plinths, pads or a slab all work, and the levels are checked across both diagonals before a single part is set down. This is site work, yours to do or ours to quote, but it is never assumed. Our assembly drawing carries the support positions for the size you order.

Access matters next, and it is easier here than for a welded unit. You need a route for a normal truck rather than a low-loader, somewhere to set the packs down within carrying distance. A clear working area around the footprint while the crew builds. Craneage is usually smaller too, because the heaviest single lift is a cassette rather than a finished office.

Weather is the last one. Panels and gaskets go together dry, and a crew can work through an ordinary day. But sealing a roof joint in heavy rain stores up a leak. So on an outdoor site it is worth planning build days around the monsoon.

Reading the six sizes: width buys rooms, length buys desks

Container office interior with two desks, drawer pedestals, a black entry door and two sliding windows

The six sizes are not one layout stretched. Width changes what the building can hold, and length changes how many people fit along the walls. Read the ladder that way and the choice gets simple.

At 8 ft wide you get one working aisle and one line of desks, and that is all. The 10 x 8 squeezes four seats in by pushing desks onto three walls. That suits a gate office or a watch room where nobody stays long. The 20 x 8 does the opposite, giving three people a real desk run and keeping the opposite wall clear so a chair can move.

At 10 ft wide, two facing desk runs become possible. That is why the 20 x 10 seats five where the 20 x 8 seats three, and why the 30 x 10 reaches twelve. The 40 x 10 is the first size that can carry a wall inside it without killing the aisle. That is how the manager cabin appears.

At 20 ft wide the building stops being a corridor. Only the 40 x 20 has that width. That is why it holds a conference room, a manager cabin, a reception, a pantry, an island of six desks and two toilets. It is also why that size can only exist as a flat-pack, because no road vehicle carries a finished floor twenty feet across.

One warning on the largest size. The toilet end carries no window and no external door at all, and two high-level louvres serve the two cubicles instead. That is deliberate. If your site expects a door on that end, change the layout on the drawing, because it cannot be changed on site.

Taking it down and putting it up again

Long container office interior with a continuous desk run, two chairs, overhead cabinets and two sliding windows

The commercial case for this build is usually reuse. A contractor who moves an office from one project to the next is buying an asset rather than a consumable. That only works if the building comes apart the way it went together. So the design keeps every bolt face, every channel and every service connection reachable after assembly.

Dismantling runs the assembly sequence backwards. Panels come out of their channels, posts release from their captive plates, and the cassettes go back onto the same lifting points they arrived on. The ceiling is chosen to keep roof fasteners and plug connections reachable, so nothing has to be cut to get at a fixing.

What gets replaced each time

Some things are consumables, and pretending otherwise causes leaks. Gaskets and sealants are inspected and replaced rather than reused by default. Bolts are checked and replaced where the coating or the thread has gone. Panel edges take the most damage in handling, and a damaged edge is a replaced panel rather than a repaired one.

Our warranty follows that logic instead of ignoring it. The quotation states the assembly cycles covered, the seal replacement expected, the bolt maintenance required and the relocation limits that apply. Damage from unlevel supports, missing components, wrong torque or worn seals put back in sits outside it, unless the installation was in our scope.

The handover pack and the checks that close the job

Handover is a document as much as a building. The pack carries the assembly sequence, the torque schedule, the component identification list and the replacement seal list. A crew that has never seen the building should be able to raise it from that pack. A visually complete delivery is not a finished job until the functional checks are done.

Those checks are specific. Bolt torque is verified, gasket continuity is inspected, the envelope gets a water test. The electrical installation is retested after erection rather than trusted from the factory. Each step exists because a bolted building is only as good as its last assembly. None of them can be done at our works on your behalf.

Power, air and water in a building that comes apart

Navy flat pack container office exterior with four sliding windows and two high-level louvre vents on the end wall

Services are where a demountable building is easiest to get wrong, so this one is wired as a harness rather than as loose cable. Circuits run in protected containment with keyed connectors between cassettes, or into accessible junction boxes where a connector will not do. Keyed means the wrong plug does not fit the wrong socket, which matters when a different crew rebuilds it.

Earthing gets the same attention. Every removable structural section has to stay bonded once the building is up, so there is an earthing conductor and an external earth point. Earth continuity and residual current protection are tested again after every relocation. This is because a building that comes apart has to be proved safe each time it goes back together.

Lights, switches, sockets and the fan or air conditioning points sit inside replaceable panels or in service zones. So a later dismantle does not mean tearing out wiring. Ventilation is by opening schedule plus an exhaust fan. A split unit point is sized to the panel core and to the occupancy you tell us about.

Plumbing is optional and appears only where the layout includes it, which in this range means the 40 x 20. Where it is supplied, it uses flexible or unioned connections, isolation stays accessible, and the quick-connect points sit outside. Wet joints can then be leak tested after each assembly rather than buried.

What this product is not

One point of honesty about the name. This is a container office in form and in fit-out, sharing the cluster's proportions, roof line and corner detailing. It is not a converted freight container, and we do not present it as a certified one. The openings in the photographs match the general arrangement inside and out. A louvre serving a toilet is a service penetration rather than a window.

What the published price covers, and what it does not

The published figures are budgetary and they are for the cabin. They cover the structure, the envelope, the openings, the standard electrical fit-out and the finishes described in the specification tab. That is at the size and layout shown on that size's general arrangement.

They do not cover foundations or levelling, transport, unloading or craneage. Site assembly labour, site utilities and any project engineering or certification your client asks for all sit outside them. So do loose furniture and optional equipment. None of that is hidden in a footnote. This is because on this build the assembly line is large enough that a quotation pretending otherwise would be useless to you.

Rates fall as area rises, on a published band rule. The 200 sq ft reference is the base, and below it the rate rises, because a small building still needs a full set of cassettes. That is why the 80 sq ft size carries the highest figure in the ladder. Above the reference the rate falls step by step, and the 800 sq ft size carries the lowest.

ScopeItems
STANDARDStructure, envelope, openings, standard electrical fit-out, finishes described in the Specifications tab
OPTIONALWet-service kit, air conditioning, upgraded finishes, branding overlays, opening accessories
CUSTOMNon-standard openings, upgraded coating systems for harsh exposure, any frame change for a special load
EXCLUDEDFoundations and levelling, transport, unloading, craneage, site assembly labour, site utilities, project engineering and certification, loose furniture

The other three ways SAMAN builds a steel office

Three other SAMAN builds answer nearby problems, and if reach and reuse are not your constraints, one of them probably fits better than this page.

Your shell may have to be a genuine freight container, with the corrugated skin and the corner castings that come with it. In that case the shipping container office is a different specification and a different argument.

The office may be for a construction project, where the fit-out question is security, records and visitor access rather than transport. Start at the site office container instead. This is because that page is written around the project phases rather than around the transport problem.

You may want a bolted kit but a porta cabin rather than a container-form module. The knock-down porta cabin is the porta cabin version of the same idea. It comes at a porta cabin rate, with a porta cabin specification behind it.

When you are still weighing footprints rather than builds, the container offices range puts every approved size and rate side by side. Come back here once you know the parts have to travel separately.

Technical Specifications

Detailed technical information and features

Structure, envelope, floor and roof

ComponentMaterial or typeSection, size or thicknessWhat it means for the buyer
Bottom frameBolted demountable base cassetteGalvanized or coated steel perimeter rails with corner blocks and replaceable floor cross-membersThe base is designed for repeated dry assembly. All connection faces, bolt holes and pack interfaces remain accessible and protected during transport.
Bottom stiffenersModular cross-member gridBolted channels or RHS members aligned with floor-board joints and partition positionsCross-members can be replaced independently and are identified for assembly. Tolerances prevent cumulative error across connected units.
Floor frameFlat-pack floor cassetteSteel joists with cement-fibre, Bison or moisture-resistant plywood deck; lifting and stacking points integratedThe floor cassette arrives as a controlled assembly or kit. Site supports must be level so bolt-up does not force the frame out of square.
Top frameBolted roof perimeter cassetteGalvanized or coated top rails with keyed corner-post connections and panel-retention channelsThe top frame provides repeatable geometry and seals. Bolts and corner interfaces are accessible for torque check and future dismantling.
Roof stiffenersDemountable roof cassette / purlin systemBolted purlins or one-piece roof cassette sized for span, weather and transport stackingRoof components are marked for orientation. Drainage fall and panel seals are achieved by the designed assembly sequence rather than site improvisation.
Corner posts / wallsRemovable corner posts and panel railsBolted galvanized or painted posts with captive plates and panel-receiving channelsPosts transfer loads between base and roof cassettes. Wall panels do not substitute for structural bracing unless the tested system expressly uses them.
Lifting / handlingPacked and assembled handling provisionsFork pockets, pack-lift points and assembled-unit lugs as approved; pack quantity and mass declaredThe collapsed pack and erected unit can have different lifting points. Components are restrained and protected from distortion or moisture in transit.
Welding & fabricationFactory-welded cassettes with dry site connectionsWelded subassemblies, corrosion-protected cut edges and bolted site assembly; no uncontrolled site weldingFactory cassettes are dimensionally checked before galvanizing or painting. Site welding is used only when explicitly engineered because it reduces reusability and coating integrity.
Exterior wallsDemountable insulated sandwich panelsTypically 50-75 mm PUF, PIR, EPS or mineral-wool panels with coated-steel faces and keyed jointsPanel type is selected for thermal and fire needs. Panels are individually replaceable and numbered to match the assembly drawing.
RoofInsulated flat-pack roof panel or cassettePUF or PIR sandwich roof / metal roof with insulation, positive fall, closures and flashingsRoof joints are assembled with specified gasket compression and fastener sequence. Drainage and corner flashings are checked before interior closure.
Interior wallsPre-finished panel faces or demountable partitionsCoated-steel panel face, laminated board or light-gauge partition systemInterior surfaces minimize wet trades and permit rapid occupation. Partition connections avoid puncturing vapour or weather seals without approved details.
CeilingPre-finished insulated roof underside or suspended panel ceilingCoated panel soffit, PVC or laminated ceiling with removable service zonesThe selected ceiling preserves access to plug connections, lights, AC drains and roof fasteners needed for maintenance or dismantling.
Floor baseCement-fibre / Bison / plywood deckTypically 18-20 mm board on bolted steel joists; edge sealing and replaceable panelsBoard joints align with supports and remain protected from ground moisture. Packing and assembly instructions specify storage off the ground.
Floor finishRapid-install commercial finish2 mm vinyl, 3-5 mm SPC or project-selected finish with removable skirting and thresholdsFinish can be factory applied to floor cassettes or installed after assembly. Joint locations permit future dismantling without destroying the full floor.

Insulation, openings, services, options and scope

ComponentMaterial or typeSection, size or thicknessWhat it means for the buyer
Wall insulationPanel-core thermal layerTypically 50-75 mm PUF, PIR, EPS or mineral wool; density and fire performance documentedCore type is chosen from climate, fire and cost requirements. Marketing terms such as fire-retardant are not used without a test standard and certificate.
Roof insulationInsulated roof cassetteTypically 50-100 mm core or separate mineral-wool layer with vapour controlRoof thermal performance includes cassette joints and corner details, which are common condensation paths in poorly assembled flat-pack systems.
Decorative / external finishFactory-coated panels and optional brand overlaysPre-painted steel, HPL or ACP feature panels, vinyl graphics and replaceable fasciaDecorative layers do not hide structural bolts or drainage points needed for future dismantling and inspection.
Fasteners & sealingReusable bolts, gaskets and compression sealsHigh-tensile or specified bolts, locking devices, EPDM gaskets, butyl tape and replaceable sealantsAssembly torque, gasket compression and sequence are controlled. Consumable seals are inspected and replaced after dismantling rather than reused automatically.
Main door / service doorPanel-compatible modular door setInsulated steel, aluminium or laminate door in reinforced cassette with replaceable sealsDoor frame is bolted to structural rails and remains square after reassembly. Threshold and lockset are protected during pack transport.
Windows / service openingModular pre-glazed window cassettePowder-coated aluminium or uPVC window, 5-6 mm glass or project safety glazingWindow cassettes arrive sealed and can be relocated only to engineered panel bays. Sills include drainage and panel-joint compatibility.
Grills / mosquito meshDemountable opening accessoriesRemovable grills, insect screens, louvers and weather hoods fixed to reinforced cassettesAccessories are packed separately where needed to avoid transit damage and are numbered for reassembly.
Electrical wiringPlug-and-play modular wiring harnessCopper circuits in protected containment with keyed inter-cassette connectors or accessible junction boxesConnectors are rated for current, environment and repeated mating. Site connections are testable and cannot be interchanged incorrectly.
Electrical protectionCompact DB and bonded modular frameMain isolator, MCB/RCBO or RCCB, earthing conductor and external earth pointEvery removable structural section remains bonded after assembly. Earth continuity and RCD operation are tested after each relocation.
Electrical fittingsPrewired lights, sockets and AC provisionsLED lights, modular switches, 6A/16A sockets, fan or AC points and data conduits by layoutFittings are positioned within replaceable panels or service zones so future dismantling does not require destructive rewiring.
Ventilation / ACNatural ventilation plus packaged AC provisionOpening schedule, exhaust fan and split-AC point sized for selected panel core and occupancyOutdoor-unit brackets and condensate interfaces are removable and do not prevent stacking of transport packs.
Plumbing / sanitaryOptional demountable wet-service kitFlexible or unioned connections, accessible isolation and external quick-connect points where includedBase office price excludes sanitary systems. Where selected, all wet joints remain accessible for leak testing after each assembly.
Layout / configurationKit-of-parts office planningPanel grid, door/window cassettes, partitions, furniture and pack list fixed on assembly drawingThe page differentiates transport efficiency, assembly labour, reuse cycles and replacement panels from a rigid container office. Site foundation tolerances are part of the procurement brief.
Painting / coatingGalvanized / factory-coated reusable steelworkHot-dip galvanized, zinc-rich plus powder or liquid coating, or project system with cut-edge repairCoating is selected for repeated handling and exposed bolt interfaces. Damaged galvanized or painted surfaces receive compatible repair before packing.
Quality checksFactory fit-up and site assembly QATrial assembly or jig check, pack-list verification, bolt torque, gasket continuity, water test and electrical retest after erectionThe handover includes assembly sequence, torque schedule, component IDs and replacement-seal list. A visually complete pack is not accepted without functional testing.
WarrantyReusable-system warranty with cycle conditionsFinal quotation states covered assembly cycles, seal replacement, bolt maintenance, panel damage and relocation limitsDamage from unlevel foundations, missing components, incorrect torque or reuse of worn seals is excluded unless installation is within supplier scope.

Two things in these tables change what you actually buy. The first is that the connections are the product: captive plates, receiving channels, reusable bolts and compression seals are what let the building come apart. They are why the rate sits where it does.

The second is that almost every line is written to stay reachable after assembly. The ceiling keeps service zones open, fittings sit in replaceable panels, wet joints keep their isolation accessible. The coating specification assumes the steel will be handled again. Read those rows as a maintenance promise rather than as a finish description.

Final grades, thicknesses, fire performance, loads and connection details all need approved project specifications and shop drawings. Nothing in these tables is a code compliance claim.

Diagram of container office construction: structural frame, insulated envelope, joints and finish, with material groups
Diagram of container office openings, electrical distribution and wet area ventilation with coordination notes

Shipping & Delivery

Freight tables and delivery terms

Container offices ship as complete steel modules on open trailers: 20-ft-class sizes on a 20 ft trailer, 40-ft-class and twin modules on a 40 ft trailer, with ODC routing planned for 20×20 and 40×12. Every dispatch includes a crane plan at both ends: the same lugs that lift the unit at our works place it on your pad. Free delivery within Bangalore city and Delhi NCR (Ghaziabad, Gurugram, Faridabad, Noida, Greater Noida). ODC charges are tentative and confirmed with your order and route.

20 ft open trailer · freight by distance (both zones)

DistanceFreight (Rs)
100–150 km25,000–30,000
150–200 km30,000–35,000
200–250 km35,000–40,000
250–300 km40,000–45,000
300–350 km45,000–50,000
350–400 km50,000–55,000
400–450 km55,000–60,000
450–500 km60,000–65,000
500–550 km65,000–70,000
550–600 km70,000–75,000
600–650 km75,000–80,000
650–700 km80,000–85,000
700–750 km85,000–90,000
750–800 km90,000–95,000
800–850 km95,000–100,000
850–900 km100,000–105,000
900–950 km105,000–110,000
950–1,000 km110,000–115,000

40 ft open trailer · freight by distance (both zones)

DistanceFreight (Rs)
100–150 km30,000–35,000
150–200 km35,000–40,000
200–250 km40,000–45,000
250–300 km45,000–50,000
300–350 km50,000–55,000
350–400 km55,000–60,000
400–450 km60,000–65,000
450–500 km65,000–70,000
500–550 km70,000–75,000
550–600 km75,000–80,000
600–650 km80,000–85,000
650–700 km85,000–90,000
700–750 km90,000–95,000
750–800 km95,000–100,000
800–850 km100,000–105,000
850–900 km110,000–115,000
900–950 km115,000–120,000
950–1,000 km120,000–125,000

Typical destinations from our Bengaluru unit (South zone)

approximate road distance, find your freight band in the tables above; final charge confirmed at quotation

CityApprox. distanceFreight band
Mysuru~145 km100–150 km
Salem~215 km200–250 km
Tirupati~250 km250–300 km
Mangaluru~350 km300–350 km
Chennai~350 km300–350 km
Coimbatore~365 km350–400 km
Hubballi~410 km400–450 km
Madurai~435 km400–450 km
Kochi~550 km500–550 km
Goa (Panaji)~560 km550–600 km
Hyderabad~570 km550–600 km
Vijayawada~630 km600–650 km

Typical destinations from our Greater Noida unit (North zone)

approximate road distance, find your freight band in the tables above; final charge confirmed at quotation

CityApprox. distanceFreight band
Agra~165 km150–200 km
Haridwar~230 km200–250 km
Jaipur~255 km250–300 km
Dehradun~285 km250–300 km
Chandigarh~290 km250–300 km
Gwalior~330 km300–350 km
Ludhiana~390 km350–400 km
Kanpur~440 km400–450 km
Lucknow~470 km450–500 km
Amritsar~490 km450–500 km
Bhopal~600 km550–600 km
Varanasi~760 km750–800 km

Distances beyond 1,000 km are quoted at booking. ODC (over-dimensional cargo) charges depend on the state. All freight figures are tentative, the final charge is confirmed once your delivery location and order are confirmed, and may vary slightly with the route and return-vehicle availability.

Customer Reviews

0 reviews

No reviews yet. Be the first to review this product.

Write a Review for Flat-Pack Container Office

Your email is not published.

Reviews are published after approval by our team.

Built by a verified manufacturer: ISO 9001:2015 certified, Udyam registered, NSIC-enlisted, GST registered.

View manufacturer credentials